English (GB)
17
5.2 Deaerating the pump
1. Open deaeration valve by approximately half a
turn.
2. Press and hold down the [100 %] key (deaeration
key) until liquid flows continuously without any
bubbles from the deaeration hose.
3. Close deaeration valve.
5.3 Calibrating the pump
The pump is calibrated in the factory for media with a
viscosity similar to water at maximum pump
backpressure (see section
If the pump is operated with a backpressure that
deviates or if dosing a medium whose viscosity
deviates, the pump must be calibrated.
Requirements
•
The hydraulics and electrics of the pump are
connected (see section
•
The pump is integrated into the dosing process
under operating conditions.
•
The dosing head and suction hose are filled with
dosing medium.
•
The pump has been deaerated.
Warning
The deaeration hose must be connected
correctly and inserted into a suitable tank!
Note
Press the [100 %] key and simultaneously
turn the click wheel clockwise to increase
the duration of the process to up to 300
seconds. After setting the seconds, do not
press the key any longer.