English (GB)
9
9.1 Display layout
Fig. 5
Display layout
Menu line
The display has four main menus:
Upper status line
The upper status line shows the following:
•
number and name of the display (to the left)
•
the symbol
in case of alarm (to the right)
•
the symbol
if the service language has been selected
(to the right).
Lower status line
The lower status line shows the following:
•
system name (to the left)
•
date and time (to the right).
Graphical illustration
The graphical illustration shows the RCME rainwater system,
including feed pump and collecting tank. The display also shows
various settings as well as system status, a historical indication or
other elements.
Scroll bar
If the list of elements exceeds the display, the symbols
and
will appear in the scroll bar to the right. Use
and
to move up
and down in the list.
10. Commissioning
10.1 Checks before first start-up
Check the following before the system is started up for the first
time:
•
Mechanical installation has been made as described in section
.
•
Electrical installation has been made as described in section
.
•
All isolating valves are open.
•
The precharge pressure of the integrated pressure vessel is
set to 70 % of the desired cut-in pressure.
For further information, see section
•
The collecting tank has been filled sufficiently with water in
order for the SPO pump to deliver water to the buffer tank.
10.2 Start-up
1. Switch on the power supply, and wait for the first display to
appear.
2. Set "Display language", "Units", "Date and time" in displays
15.5.1 Display language (4.5.1)
.
3. Make the collecting tank settings.
See section
4. Check the maximum permissible discharge pressure for the
booster pump (p
max
) and adjust, if necessary.
See section
15.2 Booster pump settings (4.2)
5. Clear any alarms.
See section
.
6. Select and define the conditions to be monitored.
See section
.
7. Ensure that the feed pump is connected electrically with the
correct phase sequence so that the direction of rotation is
correct. The feed pump can be started manually in order to
check that the pump is connected correctly.
See section
.
8. Set the feed pump to "Auto".
Set the mains water valve to "Auto".
Set the booster pump to "Auto".
See section
.
9. Activate rainwater consuming equipment, for example toilets
or garden hose, in order to prime the system and pipework.
The RCME system is now ready to supply rainwater to the
building.
D
is
pl
ay_
1
Status
Indication of system status
Operation
Changes of operating parameters
(password option)
Alarm
Alarm log for fault finding purposes
Settings
Change of system settings
(password option)
Menu line
Upper status line
Graphical illustration
Scroll bar
Lower status line