FIELD CONVERSION FROM FLOOD OIL TO OIL MIST BEARINGS
There are several types of oil mist configurations available from various manufacturers. The following
instructions are for conversion of flood oil lubrication to a continuous purge oil mist system.
(a)
Install oil mist inlet connections (14) inch at top inboard and outboard tapped connections on bearing
frame. SEE FIGURE
C.
(b)
Remove oil drain plug (408A) at bottom center of frame% inch NPT plug. Install drain connection
for oil mist system.
(c)
Refer to oil mist manufacturer's system instructions for operation and adjustment.
Figure C. Oil Mist system connection
(MTP Frame Illustrated)
4852840
Page 37
Содержание Peerless Pump 8196 Series
Страница 47: ...Engineering Data 4852840 Page 47...
Страница 48: ...Pump Trouble Shooting Common Pump Operational Problems Page 48 4852840...
Страница 50: ...ModularInterchangeabilityChart Page 50 4852840...
Страница 51: ...STP Exploded Isometric View 4852840 Page 51...
Страница 52: ...MTPExploded IsometricView Page 52 4852840...
Страница 53: ...LTP Exploded Isometric View 4852840 Page 53...
Страница 54: ...XLTP Exploded Isometric View Page 54 4852840...