5. Start-up

5.1 Shaft seal run-in

The seal faces are lubricated by the pumped liquid, 
meaning that there may be a certain amount of 
leakage from the shaft seal.

When the pump is started up for the first time, or 
when a new shaft seal is installed, a certain run-in 
period is required before the leakage is reduced to 
an acceptable level. The time required for this 
depends on the operating conditions, i.e. every time 
the operating conditions change, a new run-in period 
will be started.

Under normal conditions, the leaking liquid will 
evaporate. As a result, no leakage will be detected.

6. Adjustment 

The JP Basic Booster comes with the following 
factory settings in bar:

6.1 Calculating the cut-in and cut-out 

pressures 

The cut-in pressure is the sum of these variables:

required minimum pressure at the highest 
tapping point

head

 

from the pump to the highest tapping point

pressure loss in pipes.

Recommended cut-out pressure:
cut-in pr 0.8 - 1.5 bar.

6.2 Adjusting the precharge pressure

When the pump cut-in pressure has been 
determined, the required precharge pressure of the 
diaphragm tank can be calculated. The precharge 
pressure must be adjusted to 90 % of the cut-in 
pressure.

See the installation and operating instructions for the 
diaphragm tank. 

Caution

Do not start the pump until it has been 
filled with liquid. 

Note

We recommend to fit a non-return valve 
on the suction side of the pump.

Pump

Tank 

precharge 

pressure

Cut-in 

pressure

Cut-out 

pressure

JP Basic 

Booster

1.9

2.0

2.8

Note

The cut-out pressure must not exceed 
the maximum discharge pressure of the 
pump.

Caution

When adjusting/reading the precharge 
pressure, make sure that there is no 
water pressure on the diaphragm tank 
from the pipework.

Note

If the pressure switch setting is 
changed, the precharge pressure must 
be adjusted too.

Содержание JP Basic Booster

Страница 1: ...GRUNDFOS INSTRUCTIONS JP Basic Booster Installation and operating instructions...

Страница 2: ...2...

Страница 3: ...ne i pogonske upute 20 Magyar HU Szerel si s zemeltet si utas t s 25 UA 30 Polski PL Instrukcja monta u i eksploatacji 34 RU 39 Rom n RO Instruc iuni de instalare i utilizare 46 Sloven ina SK N vod n...

Страница 4: ...1 2002 i EN 60335 2 41 2003 Direktiva za elektromagnetsku kompatibilnost 2004 108 EZ Kori tene norme EN 60730 1 2000 i EN 60730 1 A16 2007 Direktiva o ekolo koj izvedbi 2009 125 EZ Elektri ni motori...

Страница 5: ...95 ES Uporabljeni normi EN 60335 1 2002 in EN 60335 2 41 2003 Direktiva o elektromagnetni zdru ljivosti EMC 2004 108 ES Uporabljeni normi EN 60730 1 2000 in EN 60730 1 A16 2007 Eco design direktiva 20...

Страница 6: ...must comply with local regulations and accepted codes of good practice Warning If these safety instructions are not observed it may result in personal injury Warning If these instructions are not obse...

Страница 7: ...the highest tapping point head from the pump to the highest tapping point pressure loss in pipes Recommended cut out pressure cut in pressure 0 8 1 5 bar 6 2 Adjusting the precharge pressure When the...

Страница 8: ...peat the procedure until the right cut in and cut out pressures have been obtained 7 Operation and maintenance 8 Frost protection If there is a risk of frost the tank and pump must be drained 9 Techni...

Страница 9: ...pump is disconnected after the pressure switch unit Check the cable connections b The pressure switch unit is defective Repair or replace the pressure switch unit 3 The pump does not start when water...

Страница 10: ...91 Finland OY GRUNDFOS Pumput AB Mestarintie 11 FIN 01730 Vantaa Phone 358 3066 5650 Telefax 358 3066 56550 France Pompes GRUNDFOS Distribution S A Parc d Activit s de Chesnes 57 rue de Malacombe F 38...

Страница 11: ...g Singapore 619264 Phone 65 6681 9688 Telefax 65 6681 9689 Slovenia GRUNDFOS d o o landrova 8b SI 1231 Ljubljana rnu e Phone 386 1 568 0610 Telefax 386 1 568 0619 E mail slovenia grundfos si South Afr...

Страница 12: ...g ahead makes it possible Innovation is the essence The name Grundfos the Grundfos logo and the payoff Be Think Innovate are registrated trademarks owned by Grundfos Management A S or Grundfos A S Den...

Отзывы: