background image

English (GB)

3

2. Safety instructions

3. Receiving the product

3.1 Inspecting the product

• Check the received consignment for completeness.
• Check the DID for damage.
• Install as soon as possible after unpacking.
• Do not install or connect damaged products.

3.2 Transporting the product

• Before transporting the DID, empty all pipes, hoses and flow 

cells, remove the sensors and pack them separately.

• Observe the permissible ambient conditions. See section 

12. Technical data

.

• Transport the DID carefully, do not drop. Do not expose the 

DID to strong impact, mechanical loads or vibrations.

• Keep the DID away from corrosive substances, vapours of 

organic solvents, nuclear radiation and strong electromagnetic 
radiation.

• Use the original packaging or equivalent to protect the DID 

during transport.

4. Installation

4.1 Installation location

Correct installation is important for proper functioning of the DID. 
• Make the DID easily accessible for all tasks.
• Provide sufficient space for all components of the DID.
• Avoid external interferences, such as electric and electro-

magnetic interferences by leakage current, earth fault of 
pumps, electric motors, high voltage currents.

• Protect the DID from direct sunlight and rain.
• Provide a reliable power supply for the control unit.
See also section 

12. Technical data

 and the manual "Sensors 

V1".

4.2 Installation of the DID

DID with flow cell

All parts of the DID with flow cell are assembled on a mounting 
plate with pre-drilled holes for quick and easy installation.
• Use spacers (min. 10 mm) for installation of the DID with flow 

cell on a flat wall.

See also sections 

8. Product introduction

 and 

12.4 Dimensions

.

DID with sensor for tank immersion

The CU 382 control unit of the DID with sensor for tank immersion 
can be mounted directly on a wall. See also sections 

8. Product 

introduction

 and 

12.4 Dimensions

.

4.3 Hydraulic connection

See also the labels on the mounting plate as well as the sections 

12. Technical data

 and 

14. Appendix

.

The maximum flow through the flow cell of the DID is limited by 
the integrated flow restrictor.
Use a vented outlet or a pressure-loading valve to avoid siphon 
effect. Do not install a shut-off valve in the outlet line.

WARNING
Electric shock

- Switch off the power supply before connecting the 

power supply cable and relay contacts.

- Do not dismantle the control unit.
- Installation and connection of the device and the 

associated supplementary components must only 
be carried out by qualified persons.

- Maintenance and repair must only be carried out 

by qualified persons.

- Observe the local safety regulations.

WARNING
Toxic material

- Parts of the DID can be contaminated with 

dangerous chemicals or pathogenic germs.

- If the DID has been in contact with dangerous 

chemicals or pathogenic germs, wear protective 
clothing and take all necessary precautions to 
prevent endangering your health when installing or 
dismantling the DID. 

Modification of the DID is strictly prohibited.

WARNING
Electric shock

- Switch off the power supply before installation.
- IP65 only applies, if the housing cover and the 

terminal compartment of the CU 382 are properly 
closed, and the appropriate cable glands or 
dummy caps are fitted.

- Installation must be carried out by qualified and 

authorised persons.

Содержание DID BF1

Страница 1: ...DID Installation and operating instructions GRUNDFOS INSTRUCTIONS Other languages http net grundfos com qr i 99037650...

Страница 2: ...ety instructions 3 3 Receiving the product 3 3 1 Inspecting the product 3 3 2 Transporting the product 3 4 Installation 3 4 1 Installation location 3 4 2 Installation of the DID 3 4 3 Hydraulic connec...

Страница 3: ...installation of the DID with flow cell on a flat wall See also sections 8 Product introduction and 12 4 Dimensions DID with sensor for tank immersion The CU 382 control unit of the DID with sensor for...

Страница 4: ...ease of the flow 5 Starting up the product 5 1 Initial startup 1 Connect all sensors to the CU 382 control unit See also section 6 2 Connecting the sensors to the CU 382 control unit 2 Slowly open the...

Страница 5: ...ialisation process Connect only the sensor you want to initialise to the CU 382 An individual address is allocated to the initialised sensor If no sensor was connected before the CU 382 jumps into the...

Страница 6: ...f DID with flow cell Fig 5 Components of DID with immersed sensor TM06 8088 3416 9 5 4 3 2 1 11 10 10 12 13 14 15 15 15 15 7 6 6a 8 18 T OK W X S 19 6c 6b TM06 8089 3416 Pos Description 1 Water inlet...

Страница 7: ...n marks 8 QR code 9 Type 10 Voltage V 11 Frequency Hz 12 Power consumption W 13 Humidity limits 14 Temperature limits 1 2 3 5 7 8 10 11 12 13 14 4 6 9 TM06 8610 0817 Pos Description 1 s can product na...

Страница 8: ...Moves the marker to the line above The first character of the selected line is a triangle Increases values Function button Enters the setup menus Disables or deletes values Left button Moves the mark...

Страница 9: ...05B1 pH 15 YYYY MM DD Serial 9999999 9 49 Type PID Running ls below Waiting 1 s Temp pH 4 20mA 2 lower alarm limit YYYY MM DD hh nn ss 22 1 C AV SP 6 86 7 00 ext General setup Parameter setup Controll...

Страница 10: ...0mA digital outputs PULSE or PWM AV SP AV is the actual value input parameter reading SP is the setpoint desired value of the input parameter reading Source of the setpoint External Manual AP001 A1 1...

Страница 11: ...he Up and Down buttons Confirm with OK To add a MODBUS sensor select Add MODBUS sensor with the Up and Down buttons Confirm with OK The MODBUS port for a new sensor is searched and the new sensor is a...

Страница 12: ...e configured in the MODBUS slave menu Changing the Modbus address 1 Select Address with the Up and Down buttons Confirm with OK 2 Change the address value with the Up and Down buttons Confirm with OK...

Страница 13: ...Digital Input Read in all digital inputs Internal Sensors Read in all internal sensors USB Measure the performance of the USB stick Date Time Set the time and the date Hardware Read out the hardware r...

Страница 14: ...he second reference solution Select the value in the Lab 2 field with the Up and Down buttons Confirm with OK Use a temperature compensated value 11 Select Sample 2 with the Up and Down buttons Confir...

Страница 15: ...ith the Up and Down buttons Confirm with OK 2 The default display settings are loaded from the sensor All modifications of the display settings are documented in the logbook of the CU 382 control unit...

Страница 16: ...ut settings menu a parameter can be allocated to an analog output or a digital output Analog outputs Parameter values between these two limits are calculated according to a linear calibration Assignin...

Страница 17: ...ect Period s with the Up and Down buttons Confirm with OK 2 Change the value for the duration of one pulse with the Up Down Left and Right buttons Confirm with OK 9 4 7 Parameter info The Parameter in...

Страница 18: ...e type to Manual 1 Select Type with the Up and Down buttons Confirm with OK 2 Select Manual with the Up and Down buttons Confirm with OK Changing the setpoint of the controller 1 Select Setpoint with...

Страница 19: ...1 Select D factor with the Up and Down buttons Confirm with OK 2 Change the disturbance factor with the Up Down Left and Right buttons Confirm with OK Changing the direction of the controller 1 Select...

Страница 20: ...er that can be changed is the maximum of pulses min for 100 output Changing the maximum of pulses min for 100 output 1 Select Pulses Min with the Up and Down buttons Confirm with OK 2 Change the maxim...

Страница 21: ...all logfiles to the USB stick 1 Select Copy logfile with the Up and Down buttons 2 Confirm with OK to copy the data to the USB stick Deleting all logfiles 1 Select Delete logs with the Up and Down but...

Страница 22: ...arefully with water and a soft brush 8 Screw in the flow detector back 9 Reconnect the wires of the flow detector to the CU 382 10 Refit the hose 11 Screw on the hose connection 10 1 3 Sensor See the...

Страница 23: ...layed DID All hoses and fittings are tight CU 382 control unit The digital output of the flow detector is ok Outlet Water is flowing out of the outlet hose Water is visible within the hoses Flow cell...

Страница 24: ...s no flow a The inlet valve is closed Open the inlet valve b The inlet strainer is blocked Clean the inlet strainer 8 Water is not visible in the hoses a The inlet valve is closed Open the inlet valve...

Страница 25: ...n data Internal thread of inlet and outlet Rp1 2 Size of inlet and outlet connection thread G 5 8 Inlet outlet hose connections metric ID OD mm 4 6 6 9 6 12 or 9 12 Inlet outlet hose connections inch...

Страница 26: ...age VAC 240 Maximal switchable load A 6 Maximal number of operating cycles VA 600 Required external protection Depending on the load additional snubber circuits may be required Description Unit D 320...

Страница 27: ...5 Terminal connections 4 x M12 cable gland entry one used by flow switch 1 x M16 cable gland entry IP rating IP65 Memory MB 512 industrial grade SLC Display mm 128 x 64 graphical display 70 x 40 viewi...

Страница 28: ...3 FCL2 ORP 4 710 8 765 DID 3 BF3 FCL2 PH ORP 4 960 9 165 DID 1 BF1 PH 4 250 8 085 DID 1 TI1 PH 2 075 5 875 DID 1 TI1 ORP 2 075 5 875 DID 3 TI2 ORP PH 2 850 6 800 DID 3 BF3 ORP PH 4 700 8 755 DID 1 BF1...

Страница 29: ...tact the nearest Grundfos company or service workshop TM06 5897 0216 TM06 6025 0416 Fig 12 Dimensions of CU 382 control unit front and side in mm Fig 13 Dimensions of CU 382 control unit for wall moun...

Страница 30: ...t of the sensors The sensors must always be immersed in water Avoid siphon effect Use a vented outlet or a pressure loading valve Avoid power loss of the sensors that are equipped with electrolyte and...

Страница 31: ...Documents as listed Type of product Measurement Process Control Name of product DID Model number D 320 GF1 230 D 320 GF3 230 Low Voltage Directive 2014 35 EU Standard used EN 61010 1 2010 RoHS2 2011...

Страница 32: ...an GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 4760 Telefax 81 53 428 5005 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam...

Страница 33: ...NDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 4760 Telefax 81 53 428 5005 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135...

Страница 34: ...1168 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding...

Отзывы: