9
6.6 Minimum flow rate
Due to the risk of overheating, do
not
use the pump at flows
below the minimum flow rate.
The curves below show the minimum flow rate as a percentage of
the rated flow rate in relation to the liquid temperature.
Fig. 5
Minimum flow rate
Legend
7. Technical data
7.1 Electrical data
See motor nameplate and section
9. Electrical connection
.
7.2 Frequency of starts and stops
7.3 Dimensions and weights
See CR-H, CRN-H Product Guide.
7.4 Sound pressure level
See page 22.
8. Installation
The pump must be secured to a horizontal plane and solid
foundation by bolts. When installing the pump, follow the
instructions in the following sections.
8.1 Base plate
Make sure that the base plate is clean of any debris. It may also
be necessary to have the base plate coated to protect the
material.
8.2 Foundation
The foundation/installation should be carried out in accordance
with the following instructions.
Grundfos recommends to install the pump on a concrete
foundation which is heavy enough to provide permanent and rigid
support to the entire pump. The foundation must be capable of
absorbing any vibration, normal strain or shock. As a rule of
thumb, the weight of the concrete foundation should be 1.5 times
the weight of the pump and base plate. The concrete foundation
must have an absolutely level and even surface.
Place the pump and base plate assembly on the foundation, and
fasten it. The base plate must be supported on the whole area.
See fig. 6.
Fig. 6
Correct installation
The foundation should be at least 3 to 6 inches longer and wider
than the base plate.
The mass of the foundation must be at least 1.5 times the total
mass of the pump and base plate assembly.
In installations where noiseless operation is particularly
important, a foundation with a mass up to 5 times that of the
pump and base plate assembly is recommended. The pump may
be fastened directly to an existing concrete floor if the floor meets
the criteria of a foundation.
To properly hold the base plate to the foundation, proper
foundation bolts are required. For proper holding of the base
through the foundation, the bolt length should extend from in the
foundation, the base height, and 0.25" - 0.50" above the nut.
These foundation bolts are embedded in the concrete floor or
foundation, and should be positioned according to the bolt
manufacturer’s instructions. To assist in the proper location of the
bolts, a template can be formed. The bolt locations should be
double-checked with drawings and base.
T
M
02
75
3
8 37
0
3
Curves
Description
CR-H with standard top
CR-H with air-cooled top
Caution
Never operate the pump against a closed
discharge valve.
Motor sizes
Maximum number of starts per hour
Grundfos ML
Baldor
0.33 to 5.0 hp
200
20
7.5 to 15 hp
100
15
20 to 100 hp
40
10
t [°F]
0
10
20
30
Qmin
[%]
40
60
80
100 120 140 160 180
t [°C]
140 176 212 248 284 320 356
104
Note
The pump should be placed as close to the liquid
source as possible. Adequate space for
operation and maintenance should be taken into
consideration.
TM
04 373
0 490
8
Содержание CR-H
Страница 1: ...CR H CRN H GRUNDFOS INSTRUCTIONS Installation and operating instructions ...
Страница 2: ...2 ...
Страница 62: ...62 ...