background image

12

2.7 Recommended diameter 

2.7.1 Between dosing regulator and injector

Grundfos Alldos company standard calculated with pressure drop 
p=50 mbar

The indications in this table result from pressure loss 
observations. They do not take into consideration the possible 
influence of length and diameter of lines on the operational 
reliability of the system.

DIN 19606

Chlorgasdosieranlagen zur Wasseraufbereitung
Chlorine gas dosing systems for water treatment

DIN 19607

Chlor zur Wasseraufbereitung
Chlorine for water treatment

DIN EN 937

Chlor zur Aufbereitung von Wasser für den menschlichen Gebrauch
Chlorine for the treatment of water for the human use

DIN 19643

Aufbereitung von Schwimm- und Badewasser
Treatment of swimming pool and bathing water

DIN 3179, Teil 1,2

Einteilung der Atemgeräte, Übersicht
Division of the respiratory equipment, overview

DIN 4102, Teil 2

Brandverhalten von Baustoffen und Bauteilen
Behaviour in fire of building materials and parts

DIN 477, Teil 1

Gasflaschenventile; Bauformen, Baumaße, Anschlüsse, Gewinde
Gas cylinder valves; forms, measurements, connections, threads

Length of the vacuum line in (m)

Dosing quantity (g/h)

40

100

250

500

1000

2000

4000

0

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

10

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

20

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

DN 10

30

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

DN 10

40

DN 8

DN 8

DN 8

DN 8

DN 8

DN 8

DN 10

50

DN 8

DN 8

DN 8

DN 8

DN 8

DN 10

DN 15

75

DN 8

DN 8

DN 8

DN 8

DN 8

DN 10

DN 15

100

DN 8

DN 8

DN 8

DN 8

DN 8

DN 10

DN 15

Содержание Alldos Vaccuperm VGB-103

Страница 1: ...Vaccuperm VGB 103 Compact dosing regulator GRUNDFOS ALLDOS INSTRUCTIONS Installation and operating instructions ...

Страница 2: ...uirements of the EC member states Electrical equipment designed for use within certain voltage limits 73 23 EEC Standards which have been used EN 60204 1 2006 EN 60519 1 2003 EN 60519 2 2006 Electromagnetic compatibility 89 336 EEC Standards which have been used EN 61000 6 1 2007 EN 61000 6 3 2007 EN 55014 1 2006 EN 55014 2 1997 A1 2001 Other bodies of rules applied DIN 19606 2006 IEC 64 SEC 725 1...

Страница 3: ......

Страница 4: ...em is running 17 6 6 Changing the Gas Cylinder 18 6 7 Possible faults 19 7 Maintenance 19 1 Of general interest 1 1 Structure of the documentation The Grundfos Alldos device VGB 103 is a state of the art solution which complies with recognised safety regulations Conformity with applicable standards directives and laws has been verified Nevertheless certain risks which cannot be prevented by the ma...

Страница 5: ...cordance with the intended use and are not permitted The manufacturer Grundfos Alldos accepts no liability for any damage resulting from incorrect use The system comprises state of the art components and has undergone safety related testing 2 Handling chlorine 2 1 Physical and chemical data Under normal conditions of pressure and temperature chlorine is a yellowish green gas with a pungent odour I...

Страница 6: ...ed persons from the dangerous area Helpers must pay attention to personal protection Immediately remove contaminated clothes Calm down injured persons and keep them warm with blankets Supply fresh air use oxygen respirator alternately with inhalating steam if possible No mouth to mouth resuscitation Fast and gentle transport to hospital lying sitting in case of difficulty in breathing state chlori...

Страница 7: ...autions and the manuals of the manufacturer 2 2 7 Chlorine extraction Before the extraction The chlorine containers must be stored at least for 8 hours in the container room so that the content can adapt the ambient temperature Turn chlorine drums on the support until the dip pipe and the riser pipe are placed vertically observe the markings on the drum Check tightness Connection Protect container...

Страница 8: ... all lines from the gas containers to the vacuum regulator If the plant is equipped with a nitrogen rinsing device Check tightness roughly with nitrogen Detailed checking with ammonia Checking the tightness with nitrogen Close all container valves Open container connection valves and all shut off valves up to the gas dosing system Open the connection valve of the nitrogen cylinder Slowly open the ...

Страница 9: ...alsdfkljkj sdk asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdlkfjlk lalsdk asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdlkfjlk lalsdk asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkj...

Страница 10: ...ressure regulator Option VGA 117 Regulates the difference of the pressures before and after the rate valve to a constant value Adjusted dosing flow stays constant even when the injector vacuum varies 2 5 5 Vacuummeter Option VGA 117 Displays the injector vacuum 2 5 6 Injector Creates the vacuum necessary for operating the pant Mixes the chlorine gas with the water TM04 0705 0908 Motive water Vacuu...

Страница 11: ...up Wearers of respiratory equipment for work and rescue G 26 GUV 2 6 Unfallverhütungsvorschrift Druckbehälter Regulations for accident prevention Pressure containers GUV 2 10 Unfallverhütungsvorschrift Elektrische Anlagen und Betriebsmittel Regulations for accident prevention Electrical installations and resources GUV 9 9 Unfallverhütungsvorschrift Gase Regulations for accident prevention Gases ZH...

Страница 12: ... human use DIN 19643 Aufbereitung von Schwimm und Badewasser Treatment of swimming pool and bathing water DIN 3179 Teil 1 2 Einteilung der Atemgeräte Übersicht Division of the respiratory equipment overview DIN 4102 Teil 2 Brandverhalten von Baustoffen und Bauteilen Behaviour in fire of building materials and parts DIN 477 Teil 1 Gasflaschenventile Bauformen Baumaße Anschlüsse Gewinde Gas cylinder...

Страница 13: ...bottle connection left drum connection on top Filter O Outside U Inside Direct installation B Bottle pressure input frontal D Drum pressure input left Residual pressure device 1 Yes 0 No Accuracy 4 of upper limit Control range 1 20 Empty indication Optical empty indication Flow meter According to the floater principle length of the measuring tube 70 mm Weight 1 kg 5 100 g h 0 2 5 lbs day 10 250 g ...

Страница 14: ...Dimensioned drawing of chlorine compact device TM04 0706 0908 VGB 103 131 7 82 4 92 31 4 ca 197 101 71 1 14 40 3 126 146 63 bar 16 0 Cl 20 C ALLDOS 2 0 187 8 81 8 125 ca 100 31 4 ca 257 with closed yoke G1 or G3 4 with pressure gauge G1 ...

Страница 15: ... 4 5 Checking the tightness after changing the cylinder See chapter 5 2 2 Checking the tightness 5 Commissioning 5 1 Preparations for commissioning 5 1 1 Vacuum connections Fig 15 Vacuum connections TM04 0707 0908 Item Description 1 Gas cylinder 2 Compact Dosing vaccuperm VGB 103 3 Adsorption device 4 Injector 5 Gas warning device 6 Gas sensor 1 2 3 4 5 6 10cm Warning Observe the information see c...

Страница 16: ...essure connection Slightly press the bottle in a pumping manner allowing the ammonia mist to rise up Formation of white mist The inlet valve is not tight Depressurize the plant Check the inlet valve and repair it Check tightness again Formation of white mist the inlet valve is not tight Fig 19 Ammonia chlorine gas formation of white mist No formation of white mist the inlet valve is tight Fig 20 N...

Страница 17: ...Immediately close the cylinder valve Let the system run until all parts are evacuated Switch off the system as described in the following 6 5 2 Switching off while the system is running Close the cylinder valve Let the system run until the measuring tube shows no more gas flow Close the rate valve Switch off the motive water of the injector Close the motive water valves Close the shut off valve at...

Страница 18: ...the empty cylinder move it away and protect it against falling down Place the new gas cylinder and fix it correctly Remove the protective cap from the new gas cylinder All connections must be absolutely clean and dry Insert the gasket at the pressure connection of the device Replace the filter if necessary Screw the device onto the connection of the cylinder Check the tightness Re start the system...

Страница 19: ...rs is higher than 1 of the contents of the gas cylinder the system is too small Use a dosing system with more than one gas cylinders Desired dosing flow is not reached Insufficient injector vacuum Check the injector repair it if necessary Observe the manual of the injector Check the motive water pump repair it if necessary Check the dirt trap before the injector clean it if necessary Leakage in va...

Страница 20: ...20 ...

Страница 21: ...21 ...

Страница 22: ...22 ...

Страница 23: ...o 141 0022 Japan Phone 81 35 448 1391 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia Deglava biznesa centrs Augusta Deglava ielā 60 LV 1035 Rīga Tālr 371 714 9640 7 149 641 Fakss 371 914 9646 Lithuania GRUNDFOS Pumps UAB Smolensko g 6 LT 03201 V...

Страница 24: ...dfosalldos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 15 710217 V1 0 Repl 15 710091 V1 0 15 710001 V1 0 GB 95713929 0209 Repl 96681349 1104 96681297 1004 ...

Отзывы: