Operation
20 | 32
BA_
TD
3-
G
H
000en
_015_A
uf
ber
ei
tu
ngs
gr
uppe
.doc
x
6 Operation
6.1 Functional check of the conductivity
measuring cell
► Press the button of the conductivity measuring cell.
»
The measuring cell is activated.
»
After the activation, an LED is flashing.
The conductivity measuring cell switches off after a
period of 45 minutes.
Display of the conductivity measuring cell
LED is flashing
Conductivity of the fully
demineralised water
green
< 10 µS/cm
yellow
10 – 50 µS/cm
red
< 50 µS/cm
When the LED is flashing red, the filling cartridge is exhausted.
Содержание thermaliQ:HB2
Страница 1: ...We understand water Treatment group thermaliQ HB2 Operation manual...
Страница 31: ......