Installation
16 | 32
BA_
TD
3-
G
H
000en
_015_A
uf
ber
ei
tu
ngs
gr
uppe
.doc
x
► Check the scope of supply for completeness and
possible damage.
4.3 Installing the product
1.
Install the shut-off valve at the inlet side of the treatment
group.
2.
Install the water meter screw connection at the outlet side
of the treatment group.
3.
Install the treatment group in between without any
mechanical stress. On the inlet side, use the flat gasket
and on the outlet side, use the flat gasket with cap sieve.
4.
Install the filling cartridge and the plastic cylinder. The
plastic cylinder does not have an end stop. Turn it until
the required pressing is done.
»
The installation of the product is completed.
Содержание thermaliQ:HB2
Страница 1: ...We understand water Treatment group thermaliQ HB2 Operation manual...
Страница 31: ......