
15
5 Mounting Installation
5.1 Requirements for Mounting
•
Make sure there is no electrical connection before installation.
•
In order to avoid electric shock or other injury, make sure that holes will not
be drilled over any electricity or plumbing installations.
•
Always follow the instructions when moving and positioning the inverter.
•
Improper operation may cause injuries or serious wounds.
•
In the case of poor ventilation, the system performance may compromise.
5.1.1 Location Requirements
No direct sunlight
No rain exposure
No snow lay up
Direct sunlight
Rain exposure
Snow lay up
Select an optimal mounting location for safe operation, long service life and
expected performance. Please AVOIDE direct sunlight, rain exposure, snow laying
up during installation and operation. And DO NOT install the inverter in a place
where personnel are likely to come into contact with its enclosure and heat sinks
because these parts are extremely hot during operation.
Содержание GHyper 3000
Страница 1: ...User Manual Single Phase Hybrid Inverter GHYPER EN A65 V10 2109 ...
Страница 2: ......
Страница 4: ...9 Technical Data 45 9 1 Hyper 3000 3680 5000 45 9 2 Certificates and Grid Regulations 47 ...
Страница 27: ...23 6 2 Overview of Connection Area Wire connection area of Middle control box ...