Growatt SPH 10000TL3 BH Скачать руководство пользователя страница 1

Installation

                     

                         Operation Manual

   

                       

&

Shenzhen Growatt New Energy Technology CO.,LTD

No.28 Guangming Road, Shiyan Street, Bao’an District, 

Shenzhen, P.R.China

No.28 Guangming Road, Shiyan Street, Bao’an District, 

Shenzhen, P.R.China

GR

-

UM

-

158 A

-

00

-

GR

-

UM

-

158 A

-

00

-

 +86 0755 2747 1942

 +86 0755 2747 1942

www.ginverter.com

www.ginverter.com

T
E

W

[email protected]

[email protected]

Download
Manual

Growatt New Energy

Содержание SPH 10000TL3 BH

Страница 1: ...an Street Bao an District Shenzhen P R China No 28 Guangming Road Shiyan Street Bao an District Shenzhen P R China GR UM 158 A 00 GR UM 158 A 00 86 0755 2747 1942 86 0755 2747 1942 www ginverter com w...

Страница 2: ...ty Measure 2 3 Symbols introduction on the SPH inverter Purpose Use 1 1 Preface 1 2 Target Group 1 3 Product Description 1 4 Safety Instructions 3 Product Description 4 Unpacking 5 Installation 5 1 5...

Страница 3: ...ter 14 1 storage machine product specification 14 2 DC input terminal parameter 14 3 Torque 14 4 Appendix Growatt SPH series energy 11 Decommissioning 6 Commissioning 12 Product specification 7 1 Star...

Страница 4: ...Installer can install energy storage machine of Growatt SPH TL3 BH Series rapidly and troubleshooting build communication system through read this manual carefully If you have any questions in the pro...

Страница 5: ...tilation of the service environment and temperature control in order to prevent the danger of battery explosion Battery recommended installation environment must be strictly in accordance with the spe...

Страница 6: ...ating 3 2 Label Explanation Label contains the following information for example SPH 10000TL3 BH shows as below Caution risk of danger Danger to life due to high voltage in SPH There is residual volta...

Страница 7: ...ers Safety level Ingress Protection Operation Ambient Temperature Certificates Number Growatt SPH 10000TL3 BH 1000Vdc 160 1000Vdc 15A 2 12A 2 10000W 10000VA 3W N PE 230 400Vac 15 2A 50Hz 60Hz 0 8 lead...

Страница 8: ...setscrew Ground terminal M4 setscrew Mc4 connector black connector Installation 5 5 1 Basic installation requirements A The installation location must be suitable for SPH s weight for a long period ti...

Страница 9: ...space into account about the dimensions please reference user manual N The Inflammable and explosive dangerous goods must not be placed around battery in case of cause serious danger 5 2 Installation...

Страница 10: ...board installation guide put the cardboard on the wall and make sure the top edge of the cardboard is horizontal 3 Mark four points at the wall via the hole of the paper board then remove the cardboar...

Страница 11: ...not connect to DC source 5 4 2 Connection of AC terminal and off grid terminal SPH has a grid output terminal and off grid out terminal look down on the SPH from the front the terminal on the left on...

Страница 12: ...inal and EPS output terminal connection steps as follow Step 1 Uninstall the AC terminal as below chart Step 2 Thread cables through pressure screw seal ring threaded sleeve in sequence insert cables...

Страница 13: ...d storage system Notice If you want to use on gird only please refer to chart 5 17 Connect with AC grid and float EPS OUTPUT If you have no battery now you can also float BAT terminal and this hybrid...

Страница 14: ...must be larger than 12AWG 5 4 4 Connection of meter terminal When customer needs to use meter to monitor the energy flow the meter terminal connection steps are as follows Step1 Reference 5 2 make LAN...

Страница 15: ...the filler plug from the cable support sleeve Step5 Route the CAN cable through an opening in the cable support sleeve Step6 Thread the CAN cable through the cable gland Step7 Insert the RJ45 plug of...

Страница 16: ...d lock the waterproof cover to the inverter with screws Step9 Screw the swivel nut onto the waterproof cover 5 4 7 Connection of DRMS terminal Australia only When SPH is applied to Australia the DRMS...

Страница 17: ...on the inverter until it snaps into place Step8 If no other cables need to be installed lock the waterproof cover to the inverter with screws Step9 Screw the swivel nut onto the waterproof cover PIN...

Страница 18: ...the cable such as Dry contact cable is not used please do not remove the filler plug from the cable support sleeve 5 4 10 Grounding connection SPH must be grounded by cable the grounding point is show...

Страница 19: ...rge battery by PV power as large as it can do If the customer enables the AC CHG AC grid charging functions Inverter will charge battery by PV power and AC power from grid as large as it can do Grid f...

Страница 20: ...d Each small white PIN has two statuses when set upward to ON its value turns to 1 when set downward its value turns to 0 Concerning the matching of the PIN status and the country safety standard plea...

Страница 21: ...XXXXB GT0XXXXXXC GT0XXXXXXD GT0XXXXXXE GT0XXXXXXF GT1XXXXXX0 6 5 4 3 2 1 ON DIP 6 5 4 3 2 1 ON DIP 6 5 4 3 2 1 ON DIP 6 5 4 3 2 1 ON DIP TAIWAN EN50549 Ireland India Brazil GT1XXXXXX2 GT1XXXXXX3 GT1XX...

Страница 22: ...Fault Location Description A B D C E Status ESC button cancel control Down button Enter button UP button Notice LED showing status of SPH it has two colors one is green and another is red Please turn...

Страница 23: ...Mode Ppv xxxx xxxxW PV1 PV2 voltage Battery information WorkMode Grid_R xxxV xxHz WorkMode EPS_R xxxV xxHz WorkMode Po xx xkW GridS information Output AC Power EPS R information WorkMode Pbat XXXX W B...

Страница 24: ...Power Rate 100 Power Rate 100 Priority WorkMode WorkMode Opt Load First WorkMode WorkMode WorkMode AC CHG Enable WorkMode SC _ _ _ _ WorkMode 00 00 00 00 WorkMode Save OK WorkMode Time WorkMode 00 00...

Страница 25: ...we can quickly update the software of machine You can see USB A as below Note USB is only used for firmware update Customer can t use it for charging 6 5 2 Use of RS232 port RS232 port is mainly used...

Страница 26: ...Before use WIFI communication you should make sure the follow PIN1 and PIN2 are ON Start up and shut down SPH system 7 7 1 Start up the SPH system Users can start up SPH inverters through following st...

Страница 27: ...rature output after temperature back to normal system can work normally please be patient at this time If the temperature is too low it is possible that battery will be low temperature protection at t...

Страница 28: ...is lost or not 2 Check the grid connection is good or not 3 Check the switches on the cable are on or not 1 Restart inverter 2 Please contact Growatt service center if restart can t solve the problem...

Страница 29: ...3 Shenzhen Growatt New Energy Technology Co Ltd confirms that the Growatt inverters and accessories described in this document are in compliance with the above mentioned EU directives The entire EU De...

Страница 30: ...A 15A 15A 15A 15A 15A 15A 15A 15A 15A 15A 15A 4000W 6000W 8000W 5000W 7000W 10000W 4000VA 5000VA 6000VA 7000VA 8000VA 10000VA 230V 400V 310 476V 50 60Hz 45 55Hz 55 65 Hz 6 1A 7 6A 9 1A 10 6A 12 1A 15...

Страница 31: ...system voltage IP68 0 25m model 1000V DC UL 1000V DC TUV 32A 40A 44A 65A 55 56 12 3 Torque 12 4 Appendix The following chart is the energy storage machine optional appendix list if there is a need pl...

Страница 32: ...ion code 5 SPH inverter Display content 6 The manufacturer and model of the battery 7 Battery capacity and connection mode Annex AutoTest only for Italy Follow is the chart of Auto Test refer to 6 4 4...

Отзывы: