-16-
Model G0767 (Mfd. Since 1/14)
Assembly
To assemble machine:
1. Place shipping crate near operational loca-
tion, then remove crate from shipping pallet
and set small items aside.
2. Unbolt base from shipping pallet.
3. Move base to selected location and properly
anchor it to floor (refer to
Anchoring to Floor
on previous page).
4. Remove the four cap screws that secure
electrical box inside column (see
Figure 7).
5. Slide electrical box out of column and place
on top of motor.
6. Remove column front cover by removing the
four cap screws that secure it (see
Figure 8).
7. Remove the six pre-installed cap screws from
top of base (see
Figure 9).
Figure 9. Cap screws on top of base.
Figure 10. Example photo of web slings
positioned on machine and lifting device.
8. Have another person hold machine steady so
that it does not tip, then remove hex nuts that
secure machine column to pallet.
9. Listed below are two methods for lifting
machine onto base. Use method that is best
for your operation.
— Wrap web slings around machine and
attach them to a lifting device (see
Figure
10 for an example).
Figure 7. Location of cap screws that secure
electrical box.
Electrical Box
Cap Screws
Figure 8. Location of column front cover and
securing cap screws.
Cap Screws
(2 of 4)
Front
Cover
Содержание G0767
Страница 48: ......