GREER Company Terex Insight Скачать руководство пользователя страница 1

 

 

 

Terex Operation Manual 

 

 

 

 

 

 

 

 

 

Содержание Terex Insight

Страница 1: ...Terex Operation Manual...

Страница 2: ...Line 12 Information 12 Rated Capacity 12 Erected Jib 13 System 13 Anti Two Block 13 Jib Stowed 14 Pick Points 14 Configuration Button 15 Boom Length Window 15 Boom Angle Window 15 Load Radius Window 1...

Страница 3: ...ariety of sensors The system compares the load suspended below the boom head to the crane capacity chart stored within the computer s memory At approach to overload the system sends audible and visual...

Страница 4: ...haul ball raises a weight that is mounted around the hoist rope When the weight is raised it opens the switch The resultant switch open signal is sent to the computer via the reeling drum This results...

Страница 5: ...ng this time crane motions are disabled by the system function kick out Press the Press to Continue button to acknowledge the home display message and allow the system to start normal operation NOTE N...

Страница 6: ...the current system setup Each shaded area contains one or more green indicators and a button to change the setup selection In groups with multiple options green indicators illuminate individually to...

Страница 7: ...ay 2 The MAN button enables the optional Personnel Platform 3 The POL button selects the current parts of line Pressing the POL button will increment the parts of line When the maximum parts of line f...

Страница 8: ...the display will show None 5 The PICK LONG PICK SHORT PICK MAIN selections are dependent upon the model of crane being used 6 The STOW STOWED JIB group contains one green indicator This will illumina...

Страница 9: ...SITION SENSING IF EQUIPPED The operator will be warned if the selected outrigger position does not match the detected outrigger position Correct Selection The selection will have a solid green indicat...

Страница 10: ...IRES setting contains four green indicators They indicate the selection of tires full intermediate or retracted outriggers The user must make the selection from the configuration display NOTE OUTRIGGE...

Страница 11: ...c response the load reading may vary when lifting or lower the load Meter functions carefully especially boom down to minimize the dynamic effects 3 The CANCEL ALARM button is used to silence the audi...

Страница 12: ...n 5 The INFORMATION button displays system generated messages regarding the software versions of the equipment and fault codes Press and hold the Information button to display the data The messages wi...

Страница 13: ...ne If there are no jib options available the display will show None 8 The SYSTEM has the capability of showing metric or imperial units This can be changed in the calibration menu 9 The ANTI TWO BLOCK...

Страница 14: ...e length and offset of the jib in use is also shown in the home display 11 The PICK POINT icon displays the currently selected pick point chosen on the Configuration screen If the operator has chosen...

Страница 15: ...e configuration display screen 13 The BOOM LENGTH window displays the length of the main boom from the boom foot pin to the sheave pin of the main boom head machinery 14 The BOOM ANGLE window displays...

Страница 16: ...ow displays the radius of the main boom 16 The SWING ANGLE window displays the swing of the boom relative to the zero point 17 The BAR GRAPH indicates the actual load as a percent of the rated capacit...

Страница 17: ...ecessary to use the Cancel Alarm button The Cancel Alarm button is also used to reset the function disconnect relay Press and hold the button for 5 seconds to reset the relay A second beep is heard co...

Страница 18: ...rm These buttons operate as a toggle switch If the alarm to be set is OFF pressing the button will turn the alarm ON If the alarm to be set is ON pressing the button will turn the alarm OFF NOTE Press...

Страница 19: ...minimum angle in this example 12 4 4 Press the MIN ANGLE button again to cancel the alarm The display will read MIN ANGLE OFF Setting the Maximum Boom Angle Alarm 1 Move the boom to the desired maximu...

Страница 20: ...m length in this example 58 8 ft 4 Press the MAX LENGTH button again to cancel the alarm The display will read MAX LENGTH OFF Setting the Maximum Tip Height Alarm 1 Move the boom to the desired maximu...

Страница 21: ...ther WARNING RIGHT SWING or WARNING LEFT SWING The alarm condition will once the crane is back into the working area 1 Press the Operator Alarm button twice 2 Press Next button adjacent to SET SWING A...

Страница 22: ...ets the left swing point value 6 Press the Next button to continue 7 Move the boom into the safe area and press the SET button 8 Press the Next button 9 Swing the boom to the desired right swing point...

Страница 23: ...winging to the right In this example the working arc is the larger piece of the pie WARNING THE OPERATOR DEFINED SWING ALARM IS A WARNING DEVICE ALL FUNCTIONS REMAIN OPERATIONAL WHEN ENTERING THE OPER...

Страница 24: ...g zone and the exclusion zone The set points are calculated using the tip of the boom This means the set point isn t determined just by the swing of the boom but also the distance from the centerline...

Страница 25: ...nd right points must be reset Press the LEFT POINT and RIGHT POINT buttons This will reset the set points NOTE In order for the swing alarms to function properly both alarms must be set If the procedu...

Страница 26: ...r rotate the boom to the left to avoid moving the boom through the exclusion zone 8 Press the RIGHT POINT button 9 The work area alarm set points are now set 10 To deactivate the alarms go back to the...

Страница 27: ...300 Fax 918 298 8301 www team twg com Greer Company is a part of TWG As a leader in product innovation Greer Company is committed to the ongoing improvement of its equipment We reserve the right to ma...

Отзывы: