GREER COMPANY
Crane Systems
FACTORY RECOMMENDED SERVICE
PREVENTIVE MEASURES
FOR GREER INSTRUMENTATION
DAILY OR EVERY 8 HOURS OF OPERATION
1.
EXERCISE THE METER BY ENTERING DIFFERENT VALUES IN
THE DISPLAY, SUCH AS HIGH OR LOW ALARMS, AS
APPROPRIATE TO THE METER USED. PRESS ENTER TO TEST
THE HORN, WARNING LIGHTS, AND MOTION CUTOFF SIGNAL
(IF MOTION CUT OPERATION IS INSTALLED).
2.
IF USING AN ANTI TWO-BLOCK SYSTEM, TEST THE SYSTEM BY
CAUTIOUSLY HOISTING THE HOOK(S) TO ACTUATE THE
SWITCH AND ALARM.
3.
CHECK THE METER FOR ANY VISIBLE MOISTURE AND KEEP IT
AS DRY AS POSSIBLE.
MONTHLY OR EVERY 160 HOURS OF OPERATION
1.
CHECK THE ACCURACY OF THE BA-
1510™ ANGLE INDICATOR
(METER). FOR ANGLE INDICATING SYSTEMS, VERIFY THE BOOM
ANGLE WITH AN INCLINOMETER AND COMPARE IT WITH THE
VALUE DISPLAYED. IMMEDIATELY CORRECT ANY ERRORS.
2.
CHECK ALL ELECTRICAL CABLING BETWEEN THE METER AND
ITS SENSORS TO ENSURE THAT THE CABLING IS NOT BEING
STRETCHED OR DAMAGED.