High Capacity Ratchet Knockout Drivers
Greenlee Textron / Subsidiary of Textron Inc.
5
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815/397-7070
Setup and Operation
Set the ratchet driver to the starting position, as follows.
1.
Move the ratchet direction lever to the right.
2.
Rotate the ratchet as shown. When the spindle is
fully extended, the view hole will be completely filled
with the yellow band.
3.
Select the appropriate punch and die. Use the Draw
Stud Selection Table to determine the corresponding
draw stud. Install the draw stud as shown.
Note: All draw studs for the 1904 have left-hand
threads.
Ratchet Lever
Spindle will be
close to end
4.
Snug up the draw stud with a wrench.
6.
Insert the draw stud through the pilot hole.
5.
Install the die onto the stud so that the opening of
the die faces outward.
Die
Die
Draw
Stud
Yellow will
show in
view hole