background image

High Capacity Ratchet Knockout Drivers

Greenlee Textron / Subsidiary of Textron Inc.

5

4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815/397-7070

Setup and Operation

Set the ratchet driver to the starting position, as follows.

1.

Move the ratchet direction lever to the right.

2.

Rotate the ratchet as shown. When the spindle is
fully extended, the view hole will be completely filled
with the yellow band.

3.

Select the appropriate punch and die. Use the Draw
Stud Selection Table to determine the corresponding
draw stud. Install the draw stud as shown.
Note: All draw studs for the 1904 have left-hand
threads.

Ratchet Lever

Spindle will be

close to end

4.

Snug up the draw stud with a wrench.

6.

Insert the draw stud through the pilot hole.

5.

Install the die onto the stud so that the opening of
the die faces outward.

Die

Die

Draw

Stud

Yellow will

show in

view hole

Содержание 1904

Страница 1: ...001 Greenlee Textron IM 1037 REV 6 9 01 Read and understand all of the instructions and safety information in this manual before operating or servicing this tool 1904 1904Pg 1904PgSB and 1906SB High Capacity Ratchet Knockout Drivers ...

Страница 2: ...onal ratchet drivers These ratchet drivers can be used with Greenlee standard or Slug Buster punches and dies to punch round holes from 1 2 actual size 12 7 mm through 3 conduit size 89 8 mm in plastic fiberglass aluminum and mild steel Greenlee Slug Splitter punches and dies available from 0 598 actual size 15 2 mm though 2 conduit size 61 5 mm are capable of punching through all of these materia...

Страница 3: ...ath A component failure could throw broken parts Do not allow anyone to stand in front of the punch unit Close access doors or covers on any equipment that is in line with the punch unit Failure to observe this warning can result in severe injury or death This symbol is used to call your attention to hazards or unsafe practices which could result in an injury or property damage The signal word def...

Страница 4: ...nsions cheaters to the handles When punching at maximum capacity this tool requires approximately 80 pounds of handle force Using excessive force can damage the punch driver Do not drive the ratchet after spindle motion stops Driving the ratchet after the spindle motion stops can damage the punch driver IMPORTANT SAFETY INFORMATION Set up the tool properly An improper setup could cause a component...

Страница 5: ... extended the view hole will be completely filled with the yellow band 3 Select the appropriate punch and die Use the Draw Stud Selection Table to determine the corresponding draw stud Install the draw stud as shown Note All draw studs for the 1904 have left hand threads Ratchet Lever Spindle will be close to end 4 Snug up the draw stud with a wrench 6 Insert the draw stud through the pilot hole 5...

Страница 6: ... hole Line up using crosshairs on die Punch Direction 9 Turn the ratcheting handle counterclockwise Continue to ratchet until the punch is completely through the material Do not drive the ratchet after spindle motion stops Driving the ratchet after the spindle motion stops can damage the punch driver If the spindle is at the end of its stroke and the punch is not completely through unthread the pu...

Страница 7: ...uit 28 3 mm Slug Buster 1 503 6282 8 1 7 32 30 5 mm standard 1 503 6284 4 1 7 32 30 5 mm Slug Buster 1 503 1758 0 1 conduit Slug Buster 1 501 8331 1 Pg 29 37 0 mm standard 1 503 1975 2 Pg 29 37 0 mm Slug Buster 1 503 1759 8 1 1 4 conduit 43 2 mm Slug Buster 1 501 7687 0 Pg 36 47 0 mm standard 1 503 1976 0 Pg 36 47 0 mm Slug Buster 1 503 1760 1 1 1 2 conduit 49 6 mm Slug Buster 1 501 7690 0 Pg 48 6...

Страница 8: ... Spindle Hub Unit photos 4 10 7 To complete disassembly remove above unit from vise and regrip on flats of spindle 13 Use soft jaws to prevent damage from hard vise jaws Loosen flat head screw 8 with Allen wrench and remove top washer 9 3 After retaining ring is removed lift spindle hub unit 5 out of sleeve casting 20 1 Mount unit to be repaired in sturdy vise as shown Remove ratchet wrench 1 from...

Страница 9: ...te torque capacity 17 Replace three set screws 6 and torque to 70 ft lb to 80 ft lb Use Allen socket and torque wrench of appropriate capacity Note All tightening torques must be met to ensure satisfactory operation Assembly of Ball Nut Unit into Sleeve photos 18 19 18 19 Refer to these photos and reassemble in the reverse order Inspect and re install thrust bearings Install spindle hub unit wave ...

Страница 10: ... screw so that the balls are fed along the thread and through the nut until the ball circuit is completely full 5 Remove dowel or rod being careful to not rotate the nut The balls must not be in the return tube holes balls must only be in the mesh between the ball nut and screw 6 On both ends of the return tube place a small amount of light grease GREASE 7 Load this half tube half full of balls 8 ...

Страница 11: ...pounds Apply a drop of Loctite removable thread locker 242 Lubricate the I D of this sleeve with a light coat of Molycote G 21 20 17 16 15 14 13 10 SPINDLE HUB UNIT may be repaired only at authorized service centers 11 NOTE If any balls are in need of replacement a complete set should be ordered to ensure proper consistency of size 8 9 7 6 2 12 5 4 3 Lubricate with light machine oil Locking detent...

Страница 12: ...0 3 Ball 156 diameter 84 4 13 503 3547 2 Spindle 970 x 4 60 1 14 503 0249 3 Washer thrust 1 12 x 2 09 x 250 stepped 1 15 905 3251 1 Bearing thrust 1 50 x 2 17 x 078 1 16 905 3250 3 Washer thrust 1 508 x 2 16 x 125 1 17 905 3600 2 Screw set 1 4 20 x 437 flat point socket 1 18 503 0225 6 Handle unit 1 19 502 3258 4 Grip 1 20 503 3553 7 Sleeve ratchet driver 1 21 503 3549 9 Insert alignment 1 22 905 ...

Отзывы: