7
Model GGH2O
®
Hood
Hood
Hood
Right Filler Panel
Bottom Filler Panel
Tack-welded to
hood back
5/16 inch x 3/4 inch bolts
with washers and nuts
Filler Panels
1. Unpack the hood and lay it on the lifting skid.
2. Bolt the filler panels together with 5/16 in. bolts
provided in the hardware package.
3. Position the filler panels to the hood back, and
tack-weld them into place.
4. To allow for ease of cleaning, caulk the external
seams with NSF Approved silicone caulk
(GE SCS1000, or its equivalent). The caulk is not
provided.
After the hood is secured, make the exhaust duct
connections. The fire system distributor must be
contacted at this time. After the fire system has been
installed, mount the enclosures, then the supply
plenums. If an Horizontal Supply Plenum is provided,
it should be installed before the enclosures. The hood
and accessories are now installed.
Finally, make the electrical connections from the
controls to the fans and complete the fire system
circuits as required by the job specification (job
specific wiring diagram located inside the cabinet
cover).
Installation Overview
NOTE
If you have a Back Supply Plenum (BSP), this must
be installed before the hood. Refer to page 11 for
instructions on installing the BSP.
NOTE
All hanger brackets must be used and the hood
must be properly supported while lifting to prevent
damage or distortion to the hood. The hood must be
hung level to operate properly.