Overhead Ceiling Fans
23
®
6. Install the supplied (2) 3/8 in. – 16 x 2-3/4 in. grade
8 hex bolts into the locknuts attached to the
downtube. Torque the bolts to a value of 33 ft∙lbf
(44.75 N∙m).
NOTE:
The attached locknuts are not visible while the
VFD is installed on the downtube of the fan.
MOTOR AND HUB ASSEMBLY
DOWNTUBE AND MOUNT ASSEMBLY
3/8 in. - 16 x 2-3/4 in. GRADE 8 HEX BOLT
7. Install rear VFD cover to the back of the VFD using
(4) M4-0.7 x 10mm machine screws.
NOTE:
The rear VFD cover should be installed with the
“G” on the Greenheck logo closest to the motor (not
critical for fan operation).
DOWNTUBE & MOUNT ASSEMBLY
MOTOR & HUB ASSEMBLY
FRONT VFD COVER
REAR VFD COVER
M4 - 0.7 x 10 MACHINE SCREW
Safety Retention Cable Installation
IMPORTANT:
Do not put excessive tension on the
safety retention cable during installation. Safety
retention cable should be taut with only a small amount
of slack in the cable to ensure proper functioning. Do
not allow safety retention cable to contact any sharp
edges.
IMPORTANT:
Failure to install the safety retention cable
will result in voiding of the fan warranty.
Standard Steel Cable Clamp
The following instructions apply to
standard fan installations. For fans
that were supplied with optional
Gripple
®
hardware, refer to the
instructions on page 24.
Required Components from
Bag # 916290:
• U-Bolt Steel Cable Clamp (2)
Hardware/Tools Needed (Not Included):
• Torque Wrench
• 7/16 in. Socket and Wrench
• Cable Cutters (optional)
1. From the top of the downtube, pull the safety
retention cable until it is taut inside the downtube.
2. Wrap the loose end of the safety cable around the
mounting structure. Cable may be wrapped around
structure multiple times if length allows. Do not
allow the cable to come in contact with any sharp
edges.
3. Align the loose end of the safety cable (referred to
as the dead-end) with the length of cable that is
wrapped around the mounting structure (referred
to as the live-end).
4. Attach the dead-end of the safety cable to the live-
end using the supplied 0.188 in. u-bolt steel cable.
IMPORTANT:
The first steel cable clamp must be
installed a minimum of 5-1/2 in. away from the dead-
end of the safety cable to ensure proper functioning.
IMPORTANT:
Steel cable clamps are composed of two
parts: the u-bolt and the saddle. Steel cable clamps
must be installed with the u-bolt over the dead-end
of the safety retention cable and the saddle over the
live-end of the safety cable. Failure to install steel
cable clamps in this manner may result in unsafe
operating conditions. Refer to drawing below for correct
orientation.
5. Pull the dead-end of the safety cable through the
steel cable clamps to tighten the cable. The cable
should be pulled taut, leaving only a small amount
of slack in the cable to ensure proper functioning.
6. Tighten the nuts on the steel cable clamps using a
7/16 in. socket and torque to 54 in∙lbf (6.10 N∙m),
alternating between nuts until reaching proper
torque.
7. Cut or organize excess safety cable to ensure it
does not interfere with fan performance. Make
sure to leave at least 5-1/2 in. of cable between
the dead-end of the cable and the first steel cable
clamp to ensure proper functioning.
DOWNTUBE SAFETY CABLE
DOWNTUBE & MOUNT ASSEMBLY
CABLE CLAMP
CABLE CLAMP
SADDLE
CABLE CLAMP U-BOLT
DEAD END
LIVE END
TORQUE TO 54 IN∙LBF
(6.10 N∙m)
5-1/2 IN.
MIN.
Quick Start
Guide
Gener
al
Information
Pr
e-Installation
Mechanical
Installation
Fir
e System
Integr
ation
Electrical
Installation
Fan
Netw
orking
Oper
ation And
Maintenance
Troubleshooting
Refer
ence