Operation
Pre-start Preparation
Generator Location
ƽ
This generator must have at least five feet of clearance from combustible material.
ƽ
Leave at least three feet of clearance on all sides of the generator to allow for adequate cooling,
maintenance and servicing.
ƽ
Place the generator in a well-ventilated area.
ƽ
DO NOT place the generator near vents or intakes.
Remove tightening brackets
I
Be sure to remove the tightening brackets before operating the generator set.
Install the Support Leg (only for CC1500~CC5000 frame type generator sets)
Attach the support leg to the generator frame with cap screw(M8×30) and lock nut(M8) at the
position 1~8.
CAUTION
1
2
3
4
5
6
7
8
CAUTION
Содержание CC1200-LPG
Страница 27: ...26 How to install two wheel CC1500 2000 generator set...
Страница 29: ...28 Generator Circuit Diagram CC3000 4000 5000 single voltage generator with electric start circuit diagram...
Страница 30: ...29 CC3000 4000 5000 dual voltage generator with electric start circuit diagram...
Страница 31: ...30 CC5000 Three Phase generator with electric start circuit diagram...