Installation
8
3
Installation
Read this chapter in its entirety before installing the sampling board.
3.1
Control at Delivery
When you receive the shipment, please inspect and confirm that the received scope of
supply is in accordance with the packing list and not damaged. Any discrepancy should
be reported to the supplier immediately. If any of the received parts are damaged, the
shipping company should be informed, and new parts should be made available before
completing the installation.
3.2
Where to Install the System
Satisfactory operation, faultless functions, and minimal maintenance of the sampling
board are achieved by paying attention to the following points:
•
The sampling board shall be installed in a clean area away from dust, oil mist, and
moisture. The elements of the system shall be installed at viewing level so that it is easily
accessible in connection to operation and service.
•
It is recommended that the sampling board is located very close to the sampling
point of the inert gas system to obtain current and accurate readings. Large bore sample
lines as well as longer sample lines will increase the response time due to dead volume.
3.3
Safety Aspects
Hot sensor
The sensor is hot and can cause severe burning of personnel if not handled with care.
Analyzer(s)
Before working with the analyzer(s), please read the analyzer manual in its entirety.
Installation and operation
Installation and operation of the sampling board and associated equipment must be car-
ried out by skilled personnel, and that Green Instruments does not take any responsibility
of the operation of the system and associated equipment whatsoever.