90
Test Operation, Troubleshooting and Maintenance
Replacement of the electric expansion valve
Note: be sure there is no refrigerant inside the system and power supply has been cut off before
replacement.
Steps
Image
Instructions
4. Take out the main
body.
Take out the main body of the electric
expansion valve.
5. Replace it with a
new one.
•
Solder pipes.
•
Do charge nitrogen during soldering.
•
Protection measures should be
taken during soldering to prevent
surrounding objects from being burnt
out.
6. Tighten coils,
pipe clamps and
rubber pads;
vacuum the system;
recharge refrigerant
and then put back
the panel.
•
The bulge of the coil should match
with the recess of the main body of
the valve.
•
Keep the vacuum degree to -1.0bar.
Vacuuming period would be longer
for the repaired unit.
•
Charged refrigerant should be
the same as that stated at the
nameplate.
• Power off the unit and then power it
on again.
•
Put back the panel.
(3) LSQWRF130VM/NhA-M
Содержание LSQWRF35VM/NaA-M
Страница 1: ...Service Manual Change for life A series modular air cooled chiller heat pump T1 R410A 50Hz T1 R32 50Hz...
Страница 5: ...1 Product Product...
Страница 18: ...14 Unit Control Unit Control...
Страница 29: ...25 Unit Installation Unit Installation...
Страница 58: ...54 Unit Installation 3 5 7 Electric wiring digram 1 LSQWRF35VM NaA M...
Страница 59: ...55 Unit Installation 2 LSQWRF60VM NaA M LSQWRF65VM NaA M...
Страница 60: ...56 Unit Installation 3 LSQWRF35VM NhA M...
Страница 61: ...57 Unit Installation 4 LSQWRF60VM NhA M...
Страница 62: ...58 Unit Installation 5 LSQWRF130VM NhA M...
Страница 63: ...59 Unit Installation...
Страница 64: ...60 Unit Installation The electric wiring diagrams on the unit always prevail...
Страница 66: ...62 Test Operation Troubleshooting and Maintenance Test Operation Troubleshooting and Maintenance...