88
Test Operation, Troubleshooting and Maintenance
Replacement of the 4–way valve
Note: be sure there is no refrigerant inside the system and power supply has been cut off before
replacement.
Steps
Image
Instructions
1. Remove the
front panel.
• Remove screws at the front panel.
• Loosened screws should be put
together to avoid loss.
• Pull the front panel upwards and then
remove it.
•
Properly keep the removed front panel
to avoid from being damaged.
• Note: there are two clasps at each
panel for connecting with side panels.
2. Remove the
electric control box.
•
Disconnect electric lines inside and
outside of the electric box.
•
Protection measures should be taken
to the internal elements to prevent
them from being damaged.
3. Record the
direction of
the 4–way valve
before de-
soldering. The
multi-system
unit cannot take
other system as a
example.
•
Remember installation direction before
replacement.
•
Remove coils.
• Wrap it with wet cloth to keep its
complete ness for further analysis.
• Desolder the 4–way valve.
Содержание LSQWRF35VM/NaA-M
Страница 1: ...Service Manual Change for life A series modular air cooled chiller heat pump T1 R410A 50Hz T1 R32 50Hz...
Страница 5: ...1 Product Product...
Страница 18: ...14 Unit Control Unit Control...
Страница 29: ...25 Unit Installation Unit Installation...
Страница 58: ...54 Unit Installation 3 5 7 Electric wiring digram 1 LSQWRF35VM NaA M...
Страница 59: ...55 Unit Installation 2 LSQWRF60VM NaA M LSQWRF65VM NaA M...
Страница 60: ...56 Unit Installation 3 LSQWRF35VM NhA M...
Страница 61: ...57 Unit Installation 4 LSQWRF60VM NhA M...
Страница 62: ...58 Unit Installation 5 LSQWRF130VM NhA M...
Страница 63: ...59 Unit Installation...
Страница 64: ...60 Unit Installation The electric wiring diagrams on the unit always prevail...
Страница 66: ...62 Test Operation Troubleshooting and Maintenance Test Operation Troubleshooting and Maintenance...