GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL
46
COMMISSIONING and TRIAL RUN
1 Commissioning Flowchart
Check before
commissioning
Outdoor unit
Water tank
Electric connection
Start the unit for
commissioning.
Set unit parameters.
Accept after
commissioning.
2 Precautions on Safety
Before commissioning, ensure that the power supply model, possible usage range (pipe distance,
indoor and outdoor high and low voltage difference, and power supply voltage), and installation space
meet user requirements.
After verifying that no exception exists upon commissioning, introduce the operation and maintenance
method to the customer according to the user manual. In addition, deliver the precautions and user
manual to the customer for careful storage.
3 Preparations
3.1 Tool Preparation for Commissioning
Hex key
Adjustable wrench
Phillips screwdriver
Straight screwdriver
Vacuum pump
Electronic scale
High-pressure and low-pressure gauges for the related refrigerant system
Содержание GRS-1.5/D150ANbA-K
Страница 1: ...AIR SOURCE HEAT PUMP WATER HEATER Capacity 1 5 2 4kW Rated Frequency 50Hz Operation Range 7 45 ...
Страница 3: ...GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL 1 PRODUCT ...
Страница 11: ...GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL 9 CONTROL ...
Страница 25: ...GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL 23 INSTALLATION ...
Страница 47: ...GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL 45 COMMISSIONING and TRIAL RUN ...
Страница 55: ...GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL 53 MAINTENANCE ...
Страница 70: ...GREE AIR SOURCE HEAT PUMP WATER HEATER SERVICE MANUAL 68 UNIT MAINTENANCE ...
Страница 81: ...JF00303641 ...