ERV+DX coil
29
Figure 3-13 The flow/pressure diagram
NOTE!
Before connecting air ducts, please finish the installation of the drainage system
and test whether the drainage is normal.
4 Inspection, Pilot Run and Daily Setting
4.1 Check Before Startup
After finish installation, please arrange running test to the unit before start
operation. Check before startup:
(1) Check if the arrangement of ducts is correct according to this owner’s manual.
(2) Check if the equipment is hung reliably; if the hanging frame is coated with
anti-rust paint.
(3) Check if there is sufficient space in the unit for replacing filter; if the installation
location of duct mufflers complies with the instructions besides this manual.
(4) Check if there is foreign objects or installation tools inside the duct or unit or at
the top of the duct or unit; check if the air ports are insulated completely or if the
duct connection is reliable.
(5) Check the drainage water trap of unit to ensure it is properly installed and
drainage is good.
(6) Check the integrity of refrigerant system pipeline again and check if the external
insulation layer of pipeline has apparent abrasion.