GReddy Turbo Kit
96-98 Nissan 240SX S14 (KA24DE) TD06-20G 8cm
2
Страница 1: ...GReddy Turbo Kit 96 98 Nissan 240SX S14 KA24DE TD06 20G 8cm2...
Страница 2: ...his Kit Make sure that the vehicle is not equipped with any ECU upgrade chips Use of GReddy Racing Spark Plugs ISO 7 or NGK plugs colder than factory is recommended with this kit Important 1 This inst...
Страница 3: ...1 8PT 1 13 1 8PT 1 8PF 1 14 Oil Pressure Banjo Fitting Small Male Female 1set 15 Copper Washer 10 t 1 0 2 16 Oil Return Flange Pipe 19 1 17 Oil Return Pipe 19 Weld on Type 1 18 Oil Return Spacer 15 7...
Страница 4: ...ge Harness 1 48 Injectors 370cc Top Feed Type 4 49 Injector Harness harness wire connector insulator 4set 50 Fuel Rail Assembly 1set 51 Fuel Rail Spacer 38 5mm 2 52 Fuel Regulator Adapter Fitting 1 53...
Страница 5: ...1 2 3 4 5 6 7 8 9 10 11 12 13 14...
Страница 6: ...15 16 17 18 19 21 22 26 27 32 33 34 35 36 37 38 40 41 42 43 44...
Страница 7: ...45 46 47 48 50 51 52 53 54 62...
Страница 8: ...Disconnect the air flow meter 2 4 Remove the Air cleaner assembly with airflow meter intake tube breather hose and Intake temperature sensor 2 5 Disconnect the primary and secondary O2 sensor and remo...
Страница 9: ...elded area and paint to prevent rusting 7 Reinstall the oil pan on to the engine Parts used 17 18 51 52 3 2 Thermo Cloth Installation 1 Wrap the AC line O2 sensor wire with the provided thermo cloth P...
Страница 10: ...anifold with the provided gaskets and hardware Parts used 2 38 56 3 6 Turbo Installation 1 Install the oil return pipe to the turbo using provided gasket and hardware Parts used 1 16 41 50 52 2 Instal...
Страница 11: ...between the block and the factory oil pressure sensor Parts used 10 11 12 13 2 Install the Oil Pressure line to the three way fitting and route the line under the engine by the sub frame as shown 3 I...
Страница 12: ...the hose from the turbocharger to the oil pan Parts used 21 28 42 3 8 Down Pipe Installation 1 Install the downpipe to the turbocharger as show using provided gasket and hardware Parts used 3 40 53 2...
Страница 13: ...Parts used 34 45 36 50 50 3 11 Compression Pipe Installation 1 Install C 1 C 2 to turbo out let Parts used 4 5 22 29 51 52 2 Install C 3 from C 2 to throttle body in let Secure the pipe to the radiato...
Страница 14: ...jector and Fuel rail Installation 1 Cut the factory injector harness and install the provided injector harness Parts used 49 2 Install the Fuel Regulator fitting and fuel rail fitting on to the rail u...
Страница 15: ...r White I Brown 3 Yellow Red 1 Blue Red B Red Ar Green 2 Orange Red 4 Purple Red E Black Red E Black Code Description E manage Color ECU pin B 12V ignition power Red 61 E ECU ground Black 43 Ar Air Fl...
Страница 16: ...oolant or air leeks 6 After inspection reinstall the under cover and other stock parts that was removed 7 On the initial run be sure to have a boost gauge to check the turbo actuator setting This turb...
Страница 17: ...he A A V setting RPM range it will illuminate and flash ORANGE 5 When an error is detected it will flash RED INTERACTION L E D 3 This will illuminate when there is a connection with PC Checking Error...
Страница 18: ...se Incorrect Injector 2 pulse Incorrect Injector 3 pulse Incorrect Injector 4 pulse Incorrect wiring order of the ignition signal wires Incorrect I J CH 1 wire to e Manage unit Incorrect I J CH 2 wire...