Chapter IX Turbocharging System
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
449
Section II On-board Maintenance
Fig. 9-2-1 Removal and installation procedures of the turbocharging system
WGT turbocharger
VGT turbocharger
Removal procedure
①
Turbocharger intake hose
②
Air cleaner
③
Catalytic converter pipe
④
Turbocharger heat shield
⑤
Turbocharger fuel inlet bolt
⑥
Turbocharger fuel return
hose subassembly
⑦
Turbocharger assembly
Installation procedure
Install them in the opposite order of removal