MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
414
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Section II On-Board Maintenance
1. Water Pump Assembly
Fig. 7-2-1 Removal and installation orders of water pump assembly
Removal order
①
Engine accessory
②
Damping pulley assembly
③
Timing system
④
High-pressure fuel pump
assembly
⑤
Water pump assembly
Installation order
Install them in the opposite order of removal.