Chpter IV Mechanical System
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
119
Chapter IV Mechanical System
Section I Cylinder Head
Fig. 4-1-1 Disassembly and reassembly sequences for cylinder head
Removal procedure
①
Engine accessories
②
Timing system
③
Fuel inlet pipes of both fuel
injector and fuel rail
④
Fuel return hose component
⑤
Heater water return pipe
component
⑥
Cylinder head cover assembly
⑦
Fuel injector assembly
⑧
GER condenser air intake pipe,
EGR condenser air outlet pipe,
EGR condenser
⑨
Air intake manifold pipe
⑩
Turbocharger
○
11
Exhaust manifold pipe
○
12
Glow plug assembly
○
13
Vacuum pump assembly
○
14
Camshaft bearing cap
○
15
Air intake/exhaust camshaft
assembly
○
16
Hydraulic clearance adjuster and
rocker arm
○
17
Cylinder head
Installation procedure
Install them in the opposite order of removal.