
Great Plains
| 566-170M | 04/26/2019
36
TCN5107-5313
Operating Instructions
Hitching a Trailing Implement (Optional)
Maximum rear drawbar vertical loading-350kg.
Ensure the TCN ia unfolded.
1. Raise machine to attain a suitable height to attach the
trailing implement.
2. Reverse the TCN up to the implement, ensuring that the
drawbars are correctly aligned allowing a slight clearance
to enable the machines to be coupled together.
3. Attach the hydraulic hoses between the TCN and the
implement.
4. Reverse the TCN and couple the two machines together.
5. Fully raise both machines into the road transport position.
Fold the machine(s) if necessary.
Ensure that no fouling occurs between the TCN and the towed
machine.
Any tines on the towed machine should be adjusted
so that they do not engage the soil (or should be
removed altogether).
Field Operation
This implement is designed to be pulled in the field with the
chisel engaged (including wide turns). Pulling for extended
distances with sections lifted, or routine lifting for turns, is not
recommended. Lifting for short distances to clear residue clogs
is acceptable. Lifting for tight turns or reverse moves is
required.
Equipment Damage Risk:
Do not pull for extended distances when partially raised.
Do not routinely raise for wide turns. Such practices cause
premature wear of cylinders, pins and frame components. Such
wear is not covered by the warranty.
Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with chisels on the
ground. If the inside tire stops or rolls backward, the turn is
tight and requires lift
Final Field Checklists
Use the following tables to develop a final checklist for your
tractor/Turbo-Chisel configuration.
Mechanical Checklist
Page
q
Turbo-Chisel hitched
q
Hitch pin locked
q
Safety chain secured to tractor or leading implement
q
Parking jack stowed
q
Check all tire pressures
q
Transport locks and locking valves are in the field
position
q
Implement unfolded
Hydraulic System Checklist
Page
q
Check tractor hydraulic reservoir full
-
q
Make hydraulic connections
q
Inspect connections for leaks
-
q
Unfold Implement
q
Perform a raise and lower operation
Electrical Checklist
Page
q
Verify electrical hookups solid, or connector
securely stowed if not using lights in field.
Содержание TCN5107
Страница 4: ...Great Plains Manual 04 26 2019 Table of Contents Index 2 Product Table of Contents Index ...
Страница 6: ...Great Plains 566 170M 04 26 2019 4 TCN5107 5313 ...
Страница 74: ...Great Plains 566 170M 04 26 2019 Table of Contents Index 68 TCN5107 5313 Table of Contents Index Appendix ...
Страница 77: ......
Страница 78: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...