
PL5500 Planter
Operation
Great Plains | 411-633M | 2021/10/21
49
To change the direction of the cut, turn over the disk
blade on the hub.
Marker Operation without IRC
1. Move the planter to level ground with adequate
overhead and side-to-side clearances for
unfolding/folding markers.
2. Place the tractor in park and/or set the park
brake.
3. Set the tractor marker circuit lever to neutral to
prepare to set the marker valve.
4. Set the marker valve selector lever to DOWN -
MARKER ON. The fold hydraulics will be inactive.
5. Extend the tractor marker circuit lever until the
marker is unfolded or retract the tractor marker
circuit lever until the marker is folded.
Marker Operation with IRC
1. Move the planter to level ground with adequate
overhead and side-to-side clearances for
unfolding/folding markers.
2. Place the tractor in park and/or set the park
brake.
While using the console, you may tap the
HOME
icon from almost any screen to
return to the MAIN SCREEN.
3. On the console, on the MAIN SCREEN, tap the
FOLD SEQUENCE
icon.
4. On the console, on the FOLD SEQUENCE
SCREEN, tap the
MARKER
icon.
5. Extend the tractor marker circuit lever until the
marker is unfolded or retract the tractor marker
circuit lever until the marker is folded.
11248
5
TP-75019
DOWN - MARKER ON
i
Содержание PL5500
Страница 59: ...Great Plains 411 633M 10 21 2021 52 PL5500 Planter Table of Contents Index Operation ...
Страница 105: ...Table of Contents Index ...
Страница 108: ...Table of Contents Index ...
Страница 109: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...