![GREAT PLAINS PL5500 PTO Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/great-plains/pl5500-pto/pl5500-pto_installation-and-maintenance-manual_2259481015.webp)
PL5500 PTO Pump Kit
Great Plains
| 411-774M | 2019
-
09
-
12
13
Appendix A
-
Installation
Before You Start
Most accidents are the result of negligence and
carelessness, usually caused by failure of the installer to
follow simple but necessary safety precautions. Allow no
one to install the PTO pump before carefully reading this
manual.
Fasteners may be loosely assembled. Remove fastners
before mounting the component. Due to evolving
manufacturing practices, sub
-
assemblies may already
be completely pre
-
assembled. If so, check that fasteners
are tight, and skip the unneeded assembly steps.
Torque values for fasteners are shown on page 23. One PTO pump assembly kit is required per PL5500 planter.
Inventory to make sure all parts are present before installing. Make sure you have assembled all required tools prior
to install.
Tools Required
•
basic hand tools,
•
6 to 12 gallons of good quality 10
-
W30 mineral base hydraulic fluid, viscosity from 70
-
250 SUS range at 210°F
(100°C),
•
bucket for collecting oil,
•
hose marker, such as white electrical tape and indelible marker,
•
grease pencil,
•
a measuring tape with clear, linear-measurement markings,
•
power equipment with a compatible PTO for flushing and charging the system,
•
the PL5500 planter Operator and Parts manuals (see page 6), and
•
protective footwear if the PL5500 planter has coulters or row cleaners installed.