60
3P1006NT
Assembly
Assembly
The drill components are delivered in one or more
standard ISO intermodal shipping containers.
Once the contents have been removed, the
containers are returned to commerce. Before
releasing the container(s), verify that the drill is the
correct model and has all specified options.
Inside the containers, the drill components are on
unpainted steel racks. Major sub-assemblies are
secured to rack tubing. Smaller sub-assemblies,
cartons, bags, and loose components may be on the
rack floors.
After the drill is assembled, the racks, and any
fasteners used to secure components to the racks,
are not returned to Great Plains. They may be
salvaged or scrapped.
Pre-Assembly Checklist
Before assembling, read and understand “
Have at least two people on hand while
assembling.
Make sure assembly area is solid, level, and free
of obstructions (preferably an open concrete
area).
Make sure that after unloading there is room
enough to connect a tractor to the drill.
Have all major components, fasteners, and pins
that were shipped with the drill.
Have a copy of the parts manual on hand. If
unsure of proper placement or use of any part or
fastener, refer to the parts manual.
Tools required
a properly rated forklift, or two forklifts with the
properly rated combined capacity for the drill
hoist with 277 kg (500 lb) capacity
basic hand tools
Unloading
The drill needs to be unloaded on a flat, level, and
dry surface,
Allow for forklift access from any direction, and final
tractor hitching. Also allow for forklift and tractor
turns.
1.
Remove a rack from the container and position it
clear of the assembly area.
Configuration of the drill and components on
the rack may be different from the one
shown above, but the instructions for
assembly will be the same.
Crushing Hazard
Do not remove fasteners holding the drill to
the rack at this time. Only remove drill
fasteners when drill is fully supported.
2. Remove lift-assist, walkboard, and smaller
components from the rack. Place them well out of
the area needed for unloading the drill.
12.2m
3m
? m
~25m Suggested Minimum
Rack
Container
71007
i
!
Содержание 3P1006NT-1575
Страница 79: ...Table of Contents Index ...
Страница 80: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...