Connections - Installation
Switching on the machine
Always switch on the chiller before the machine (only for ENERGY machines).
Check that the water cooling circuit is operating properly. Check that water cannot leak
onto the electronic components of the machine.
1. Place the switch in the "I" position (On).
The screens must follow on from one another:
L01 SETUP
FPGA
X.X
<< GRAVOGRAPH >>
FPGA
X.XX
LCD
SOFT
X.XX
32
Mo
BOOT
X.XX
<READY TO RECEIVE >
The machine is ready for operation.
Do not load files until the display says "Ready to receive". This could cause incorrect
loading of the file. Loading a damaged file could cause incorrect laser emission, which
could damage the engraving machine.
Resolution of the problems
If the machine does not switch on:
•
Check that the power cord is correctly plugged in to both the machine and the power supply.
•
Check that there is power to the mains plug.