Grain+Rod Wine Rack Panel Скачать руководство пользователя страница 1

Grain + Rod

Wall Mounted Wood and Metal Wine Rack Panel Installation Instructions 

The following instructions can be used for all configurations of the Grain + Rod modular wine wall  

system.

Video guides, spec sheets, and additional support are available at grainandrod.com. 

•  (1) Wood board
•  (3, 6, or 9) Vino Pins 

or Vino Rail

•  Extension studs  

(optional)

•  (6 or 18) 35mm 

screws

Parts List & Configurations

•  (3) Keyhole hangers
•  (6) Keyhole screws
•  (3) Sprial Drywal Anchors
•  (3) Wood lags
•  (1) Plotting Guide

Step 1:

 

Attach the Keyholes

Using 2 short wood screws for each hanger, affix 3 metal 

keyholes to the corresponding pre-drilled holes on the 

back of the wood board. Position the hanger with the 

smaller side of the opening toward the top of the board.

Step 2:

 

Install the Racks

Insert the 35mm screw sthrough the back of the board so 

the screw head fits into the inset hole. For Vino Pins* lay-

outs, ensure the base Pin (wider impression) is installed 

on the lower of the two holes, and the neck Pin (narrower 

impression) is installed in the higher of the two holes. 

Thread the Pin or Rail to the front of the board onto the 

exposed screw that is sticking through. With a screw-

driver or drill, tighten the Pin or Rail. 

Repeat for remaining Pins or Rails.

* If installing a two-deep or three-deep Vino Pins config-

uration, connect the extension Pins before attaching to 

the board. Thread a stud into one end of the extension 

Pin and screw the starter base Pin onto the remaining 

exposed end and firmly hand tighten. Connect any ad-

ditional extensions in a similar fashion for both the neck 

and base side of the Pins. 

Отзывы: