3.
Setup and Connections
NOTICE
Do not store or set up the system in an area where it is directly exposed to sunlight. High temperatures
can adversely affect the precision of the system, and sunlight can affect the optical home sensor. Do not
operate the robot where electrical noise is present.
3.1
Installation Requirements
The system should be placed in a location where the front panel controls can be
1.
viewed and accessed.
Ventilation holes on the components should not be blocked.
2.
The equipment is grounded through the power cord. Connect to a properly
3.
grounded power source before operating.
The equipment must be grounded to
reduce the risk of static sparking and
electric shock. Electric or static sparking
can cause fumes to ignite or explode.
Improper grounding can cause electric
shock. Grounding provides an escape wire
for the electric current.
The air pressure for the main air supply should be between 70 and 100 psi
4.
(0.48 and 0.70 MPa).
NOTICE
It is imperative that the air supplied to the jet is clean, dry, and free from debris and water. A 40 micron
filter is highly recommended. If the air is not clean and dry, serious damage can occur to the air solenoid
valves.
3.2
Setup Overview
Remove shipping brackets
1.
Attach the PC
2.
Connect the controller and robot
3.
Connect the PC
4.
Mount the jet
5.
Connect the jet
6.
Turn on power
7.
Test system components (pneumatics, communication, I/O, emergency stop)
8.
Page 8 of 18
UniXact Automated Jet Dispense System Installation
3A5913B