background image

 

4. 

Power and Test Components 

4.1 

Turn On Power to System Components  

 

Note: Turn on power in the order listed. 

 

Advanjet Controller: 

Use the main power switch on the controller front panel. 

1.

 

Monitor: 

Use the main power button on the front of the monitor.

 

2.

 

Keyboard and Mouse

  are battery powered and have individual power switches. 

3.

Wireless communication is enabled when PC is powered on. 

 

Robot:

 Use the Main power switch on the robot rear panel.  

4.

Note: After turning on the Robot power, wait for the beep before booting the PC

 

and running the Dispense Pro Software. This can take up to 40 seconds.

 

 

PC:

 Use the power button on the PC front  

5.

 
 

4.2 

Test Pneumatic Connections 

 
1.  Use the Jet Pressure 

Regulator to set Jet 
Pressure to 40 psi 
(0.28 MPa). 

 

2.  Press the 

Trigger

 

button and listen for the 
air bursts when the 
valve closes and opens. 

 

 

3.  Tap 

Fluid Pressure 

on the Controller touch 
screen. When the field 
shows a red border, tap 

Keypad

 and set Fluid 

Pressure to 20 psi 
(0.14 MPa). 

4.  Turn the 

Fluid Air

 

switch ON. Listen for air 
flowing from the fluid 
receiver head. 

 

 
 

 

3A5913B 

UniXact Automated Jet Dispense System Installation 

Page 13 of 18 

Содержание UniXact B300

Страница 1: ...l environments Not for use in explosive atmospheres or hazardous classified locations For professional use only Models B300 and B300 HM See page 3 for model information Important Safety Instructions R...

Страница 2: ...Cables and Air Lines 10 3 6 Connect PC and Peripherals 11 3 7 Mount the Jet 11 3 8 Connect Jet Cables to Robot Z Head 12 3 9 Connect Components to Power 12 4 Power and Test Components 13 4 1 Turn On P...

Страница 3: ...nsing Parameters Supplement 3A5914 UniXact Automated Jet Dispense System Software 3A6674 UniXact Automated Jet Dispense System Parts Models Model Part No Description B300 25B350 System B300 HV 2100 30...

Страница 4: ...usage of the system can cause electric shock Turn off and disconnect power cord before servicing equipment Connect only to grounded electrical outlets Use only 3 wire extension cords Ensure ground pr...

Страница 5: ...Sheets SDSs from distributor or retailer Check equipment daily Repair or replace worn or damaged parts immediately with genuine manufacturer s replacement parts only Do not alter or modify equipment...

Страница 6: ...Camera Included Integrated Prime Purge Included Tip Detection Included Workpiece Detection Mechanical or Laser Data Storage PC Storage USB I O Signal Port 8 Inputs 8 Outputs Control Method PTP and CP...

Страница 7: ...2 CAMERA 3 MECHANICAL HEIGHT SENSOR 4 PC 5 PRIME PURGE STATION 6 TACTILE SWITCH 7 LIGHTED START BUTTON 8 EMERGENCY STOP BUTTON 9 ADVANJET HV 2100C JET CONTROLLER 10 ADVANJET HM 2600C HOTMELT JET CONTR...

Страница 8: ...e risk of static sparking and electric shock Electric or static sparking can cause fumes to ignite or explode Improper grounding can cause electric shock Grounding provides an escape wire for the elec...

Страница 9: ...G BRACKET 1 SCREW SHBS M4 X 8 2 SCREWS SHBS M3 X 8 Y AXIS SHIPPING BRACKET 1 SCREW SHBS M4 X 8 2 SCREWS SHBS M3 X 8 Z AXIS LOCKING SCREW SPACER X AXIS REMOVE LOCKING BRACKET SCREWS REMOVE BRACKET APPL...

Страница 10: ...luid Pressure Tubing CLEAR Robot Controller FLUID PRESSURE 3 Jet Pressure Tubing BLACK Robot Controller JET PRESSURE 4 Air In Tubing BLUE Robot Controller AIR IN 5 I O DB 26 Controller I O Robot I O P...

Страница 11: ...st line 3 mm up as shown in Figure 9 center For 6 mmm nozzles align the jet mount bottom with the second line 6 mm up as shown in Figure 9 right Use a 3 mm wrench to tighten the four jet mount screws...

Страница 12: ...er cord adapter set P N 25E557 with connectors for each of the regions listed is provided for the robot the controller and the monitor Standard 115 V 10A cord for USA Mexico Canada Taiwan and similar...

Страница 13: ...on the Robot power wait for the beep before booting the PC and running the Dispense Pro Software This can take up to 40 seconds PC Use the power button on the PC front 5 4 2 Test Pneumatic Connections...

Страница 14: ...he table In the navigation window of the DispensePro home screen click on a point in the 3 work surface area to move the robot The robot should move to that location Install the diaphragm and nozzle p...

Страница 15: ...ome resistance to motion but each axis should move freely X Axis Move the Z head left and right Y Axis Move the work surface table back and forward Z Axis Move jet mount up and down Press the red Trig...

Страница 16: ...ows Start icon then click the power button 2 and select Shut Down Monitor Use the main power button on the front of the monitor 3 Robot Use the Main power switch on the robot rear panel 4 Advanjet Con...

Страница 17: ...Notes 3A5913B UniXact Automated Jet Dispense System Installation Page 17 of 18...

Страница 18: ...ales injury to person or property or any other incidental or consequential loss shall be available Any action for breach of warranty must be brought within two 2 years of the date of sale GRACO MAKES...

Отзывы: