Meter
Meter
Meter Calibration
Calibration
Calibration
NOTE:
NOTE:
NOTE: See Setup
Setup
Setup Screen
Screen
Screen 4
4
4 for further screen
information, if needed.
When
When
When to
to
to Calibrate
Calibrate
Calibrate
• The first time the system is operated.
• Whenever new materials are used in the system,
especially if the materials have viscosities that
differ significantly.
• As part of regular maintenance to retain meter
accuracy.
• Whenever a flow meter is serviced or replaced.
Read
Read
Read Before
Before
Before Calibration
Calibration
Calibration
• Meter k-factor on Setup
Setup
Setup Screen
Screen
Screen 4
4
4 is updated
automatically after the calibration procedure is
completed. You also may manually edit the
k-factor if desired.
• All values on this screen are in cc or cc/pulse,
regardless of the units set in the other Setup
screens.
• Before calibrating the meter, be sure the system
is primed with material.
• Disable alarms before calibration.
Calibration
Calibration
Calibration Steps
Steps
Steps
1.
Press
to enter Setup Mode.
2.
Press
to move to Setup Screen 4.
3.
Press
to enter the screen.
4.
Press
to begin the calibration.
3A2040H
17