![Grace m908 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/grace/m908/m908_user-manual_2249697020.webp)
m908 User Manual, Rev. G
•
"push" refers to a quick push and release of a switch.
•
"push-hold" refers to a 1/2 second push and hold of a switch.
•
"push long-hold" refers to a 3 second push and hold of a switch.
5.2 Power Up
After making the appropriate power and signal connections turn on the m908 PSU.
NOTE: It is always recommended that power amplifiers and powered monitor speaker be
turned on
after
the m908 to avoid any transients reaching the loudspeakers.
The illuminated switches on the RCU will go through a test sequence and then the LCD
display will indicate that the system firmware is loading. This process takes approximately 1
minute.
Once the system has loaded the RCU will display the Home Screen and the m908 will be
operational.
5.3 Home Screen
Page 20 of 135
Illustration 9: m908 System Load Splash Screen