background image

HR/BIH

 

EN

 

 
UPUTE ZA UPORABU 

 
INSTRUCTIONS FOR USE 

 

 
 
 
 

 

 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TC 120-150 SPLIT 

Содержание TC 120-150 SPLIT

Страница 1: ...HR BIH EN UPUTE ZA UPORABU INSTRUCTIONS FOR USE TC 120 150 SPLIT...

Страница 2: ...2...

Страница 3: ...urnosnoga ventila mora biti postavljen u smjeru nadolje u podru ju u kojem ne smrzava Za pravilan rad sigurnosnoga ventila morate samostalno obavljati redovite kontrole kako biste uklonili vodeni kame...

Страница 4: ...Radi lak eg nadzora i zamjene magnezijeve anode preporu amo da ispod ure aja odnosno do poda ostaviti dovoljno prostora vidi postavljanje U protivnome ete prilikom servisnoga zahvata morati demontirat...

Страница 5: ...vrsto u zida koji mora podnijeti masu uklju uju i i vodu u kotlu Preporu amo postavljanje koje omogu uje to kra e plinske veze Prilikom postavljanja uva avajte minimalne razmake ure aja od zida poda i...

Страница 6: ...vr enja budu primjereni za postavljanje ure aja Prilikom monta e na zid uva avajte lokalne propise Sl 2 Monta ne mjere vanjske jedinice agregata Postavljanje odvodnoga nastavka U odvodno koljeno stav...

Страница 7: ...trole kako biste uklonili vodeni kamenac i provjerili da sigurnosni ventil nije blokiran Prilikom provjere morate pomicanjem ru ke ili odvijanjem matice ventila ovisno o tipu ventila otvoriti odvod iz...

Страница 8: ...vanjske jedinice agregata Cijev s namjenskim alatom odre ite malo dulju nego to je izmjeren razmak Neka spojni kabeli budu oko 1 0 m dulji od duljine cijevi Sl 5 Priprema cijevi Uklanjanje iglica Uklo...

Страница 9: ...ukom zategnite matice s rubom zatim ih zategnite klju em i momentnim klju em kako je prikazano na slici Sl 9 Zatezanje priklju ka Upozorenje Prekomjerni moment zatezanja mo e prelomiti maticu ovisno o...

Страница 10: ...go mjesto pra njenje obavite ure ajem za zahvatanje rashladnoga sredstva Provjerite je li rashladno sredstvo koje je dodano u rashladni sustav u svakome slu aju u teku em stanju Dopunjavanje rashladni...

Страница 11: ...u jedinicu kotao treba ugraditi priklju ni kabel minimalnoga promjera 1 5 mm2 H05VV F 3G 1 5 mm2 Da biste to u inili morate ukloniti za titni poklopac s toplinske crpke Priklju enje toplinske crpke na...

Страница 12: ...lo en Kabel mora zadovoljavati minimalnu kvalitetu H05RN F promjera od 1 0 do 1 5 mm2 Neka kablovi za spajanje na vanjskoj strani budu dodatno za ti eni od atmosferskih utjecaja i drugih potencijalnih...

Страница 13: ...ljenja 3 Provjera odvodnih tokova provodi se tijekom probnoga rada Za vrijeme probnoga rada kad zavr ite monta u serviser mo e koristiti senzor napona i multimetar te obaviti provjeru odvodnih tokova...

Страница 14: ...odu iz nje zbog opasnosti od smrzavanja Za tita od prekida elektri ne energije U slu aju prekida elektri ne energije podaci o pode avanju ostaju pohranjeni nekoliko sati Nakon ponovnoga pokretanja top...

Страница 15: ...pritiskom na polje 5 odnosno kad polje 5 prestane treperiti Na zaslonu se nakon nekoliko sekundi prikazuje stvarna temperatura Prilikom prekida u dovodu mre nog napona ostaje posljednja pohranjena vri...

Страница 16: ...jeljka do petka i od subote do nedjelje potrebno je podesiti sva tri vremenska perioda prema gore opisanom postupku b Uklju enje isklju enje tajmera Pritiskom na polje 11 uklju ite pode eni vremenski...

Страница 17: ...e samostalno ve obavijestite najbli u ovla tenu servisnu slu bu o tome SMETNJE U RADU Unato bri ljivoj proizvodnji i kontroli prilikom rada toplinske crpke mo e do i do smetnju koje mora ukloniti ovla...

Страница 18: ...2 l 151 199 Nazivni tlak MPa bar 0 6 6 0 9 9 Masa kotla napunjen vodom kg 51 169 59 206 Masa vanjske jedinice prazna kg 29 Za tita kotla od korozije Emajlirano Mg anoda Debljina izolacije mm 40 85 Stu...

Страница 19: ...ric pressure The outlet of the safety valve should be installed facing downwards and in a non freezing area To ensure proper functioning of the safety valve the user should perform regular controls to...

Страница 20: ...ong enough We recommend leaving enough space between the floor and the unit as to provide easy access to the Mg anode se Installation If not the unit will need to be dismounted from the wall before se...

Страница 21: ...ith the weight of the water inside the boiler It is recommended to choose a place that enables installation with minimum gas pipeline length During installation please bear in mind the minimum distanc...

Страница 22: ...ructure and anchoring method are appropriate for the unit When mounting the unit on the roof please take into account the local regulations Fig 2 installation dimensions of the outdoor unit the aggreg...

Страница 23: ...correct operation of the safety valve the valve must be regularly checked to remove limescale and check if the safety valve is blocked When checking the valve push the lever or unscrew the nut of the...

Страница 24: ...e aggregate With appropriate tools cut the pipe a little longer than the measured distance Connecting cables should be about 1 0 m longer than the pipe length Fig 5 Pipe preparation Deburring Complete...

Страница 25: ...ficiently tighten the flare nuts with your fingers and then tighten them with a spanner and torque wrench as shown Fig 9 Tightening the connection Warning Excessive torque can break the nut depending...

Страница 26: ...evacuation using a refrigerant pumping device Make sure the refrigerant added into the air conditioner is in the liquid form The adding of a refrigerant should be carried out on a low pressure servic...

Страница 27: ...minimum cross sectional area of at least 1 5 mm2 H05VV F 3G 1 5 mm2 should be installed in the indoor unit To do that the protective cover must be removed from the heat pump The connection of the heat...

Страница 28: ...e must comply with the minimum quality standard H05RN F with a cross sectional area of 1 0 to 1 5 mm2 On the outdoor side the connecting cables must be additionally protected from the elements and oth...

Страница 29: ...by visual detection and grounding resistance tester 3 Electrical leakage check performing during test running During test operation after finishing installation the serviceman can use the electro pro...

Страница 30: ...the screen is field no 9 If you switch off the heat pump for a longer period of time the water must be drained from the pump if there is any danger of freezing Power failure protection In case of powe...

Страница 31: ...nking By pressing or you can change the temperature setting from 10 C to 75 C pre set to economic temperature of 55 C The setting is stored by pressing field no 5 again or when field no 5 stops flashi...

Страница 32: ...by pressing field no 11 or wait for field no 12 to stop flashing and the setting to be saved automatically To set the timer operating mode for each day of the week or for the period from Monday to Fr...

Страница 33: ...bient temperature too low Can you hear the operation of the compressor and fan Please do not try to eliminate malfunctions by yourself call your nearest authorized service company OPERATION ERRORS Des...

Страница 34: ...essure MPa bar 0 6 6 0 9 9 Weight of boiler filled with water kg 51 169 59 206 Weight of outdoor unit empty kg 29 Anti corrosion protection of tank Enamelled Mg anode Insulation thickness mm 40 85 Deg...

Страница 35: ...35...

Страница 36: ...05 2017 561332...

Отзывы: