Goorui GHBG 34 Series Скачать руководство пользователя страница 1

Add: 1st floor,1st Bldg, Pengdong Ind Park, Shuilian Mountain, Nanchen DongGuan, China 

www.goorui.com

  

www.gooruisidechannelblower.com

 

 

 

 

 

 
 

 

Instruction Manual

 

 
Side Channel Blower

 

 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

        
 
 
      
 

 
      
 
 
 
      Dongguan Foersheng Intelligent M&E Co., Ltd   
      Hong kong Fenglisheng Group Company Limited  

 
 
  

Содержание GHBG 34 Series

Страница 1: ...dong Ind Park Shuilian Mountain Nanchen DongGuan China www goorui com www gooruisidechannelblower com Instruction Manual Side Channel Blower Dongguan Foersheng Intelligent M E Co Ltd Hong kong Fenglis...

Страница 2: ...3 2 Inlet Filter 6 2 3 3 Silencer 6 3 Installation 7 3 1 Installation Conditions 7 3 2 Connecting Lines Pipes 8 3 2 1 Suction Connection 8 3 2 2 Discharge Connection 8 3 3 Electrical Connection 8 3 3...

Страница 3: ...lways wear appropriate personal protective equipment in accordance with the local regulations The machine has been designed and manufactured according to state of the art methods Nevertheless residual...

Страница 4: ...ntain Nanchen DongGuan China www goorui com www gooruisidechannelblower com 2 Product Description IN Suction connection OUT Discharge connection NOTE Technical term In this instruction manual weconsid...

Страница 5: ...ompression of air and other dry non aggressive non toxic non flammable and non explosive gases Conveying of other media leads to an increased thermal and or mechanical load on the machine and is permi...

Страница 6: ...essure regulating valve controls pressure when the machine is used on Overpressure duties 2 3 2 Inlet Filter Theinletfilterprotectsthe machineagainstdustandothersolidsintheprocessgas The inlet filter...

Страница 7: ...Add 1st floor 1st Bldg Pengdong Ind Park Shuilian Mountain Nanchen DongGuan China www goorui com www gooruisidechannelblower com 3 Installation 3 1 Installation Conditions 40 mm 40 mm 40 mm 60 mm...

Страница 8: ...presentative themotorshouldbe de ratedorthe ambient temperature limited If the machine is installed outdoor Provide a protective cover against the weathering effects 3 2 Connecting Lines Pipes Remove...

Страница 9: ...ovide overload protection according to EN 60204 1 for the motor Makesure that the motorof the machine will not beaffected by electric or electro magnetic disturbance from the mains if necessary seek a...

Страница 10: ...hine Operation in the wrong direction of rotation can destroy the machine in a short time Prior to start up ensure that the machine is operated in the right direction If the rotation of the motor must...

Страница 11: ...g machine Risk of damage to hearing If persons are present in the vicinity of a non noise insulated machine over extended periods Make sure that ear protection is being used Make sure that the install...

Страница 12: ...considered as starting values which should be shortened or extended as appropriate Particularly heavy duty operation such as high dust loads in the environment or in the process gas other contaminati...

Страница 13: ...ing that is described in this manual should be done through GOORUI WARNING Machines contaminated with hazardous material Risk of poisoning Risk of infection If the machine is contaminated with hazardo...

Страница 14: ...ecial waste in compliance with applicable regulations Dispose of the machine as scrapmetal 8 Spare Parts NOTICE Use of non GOORUI genuine spare parts Risk of premature failure Loss of efficiency The e...

Страница 15: ...er defective Replace impeller Impeller is jammed Open the cover remove foreign body and clean Check the impeller gap Bearing on motor side machine side is defective Replace defectivebearing Motorprote...

Страница 16: ...let screen is partially clogged Clean the inlet screen Incase avacuum relief valve is installed Thevacuumreliefvalveis misadjusted ordefective Replace the vacuum relief valve Incaseaninletfiltervalvei...

Отзывы: