Goodwe DNS Series Скачать руководство пользователя страница 1

User Manual

V1.0-2022-12-15

Grid-Tied PV Inverter

DNS Series

2.9-6kW

Содержание DNS Series

Страница 1: ...User Manual V1 0 2022 12 15 Grid Tied PV Inverter DNS Series 2 9 6kW...

Страница 2: ...ptions here are for guidance only and other GOODWE trademarks are trademarks of GoodWe Technologies Co Ltd All other trademarks or registered trademarks mentioned in this manual are owned by GoodWe Te...

Страница 3: ...uirements 4 2 6 EU Declaration of Conformity 5 3 Product Introduction 6 3 1 Application Scenarios 6 3 2 Supported Grid Types 6 3 4 Appearance 6 3 4 1 Parts 6 3 4 2 Dimensions 7 3 4 3 Indicators 8 3 4...

Страница 4: ...l 25 7 Equipment Commissioning 26 7 1 Check Before Power ON 26 7 2 Power On 26 8 System Commissioning 27 8 1 Indicators and Buttons 27 8 2 Setting Inverter Parameters via LCD 27 8 2 1 Inverter Paramet...

Страница 5: ...subject to update without notice For more product details and latest documents visit https en goodwe com This manual applies to trained and knowledgeable technical professionals The technical personn...

Страница 6: ...defined as follows DANGER Indicates a high level hazard that if not avoided will result in death or serious injury WARNING Indicates a medium level hazard that if not avoided could result in death or...

Страница 7: ...ndards and safety regulations Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety Wear anti static gloves cloths and wrist strips when to...

Страница 8: ...hold waste Discard the product in compliance with local laws and regulations or send it back to the manufacturer DANGER Do not apply mechanical load to the terminals otherwise the terminals can be dam...

Страница 9: ...on Authorization and Restriction of Chemicals EC No 1907 2006 REACH GoodWe Technologies Co Ltd hereby declares that the inverter without wireless communication modules sold in the European market meet...

Страница 10: ...erts the DC power generated by the PV module into AC power and feeds it into the utility grid The intended use of the inverter is as follows PV String Inverter Circuit Breaker Circuit Breaker optional...

Страница 11: ...y differ depending on actual needs Connect the RS485 Communication Cable Update the software version of the inverter using a USB flash driver 5 DRED CT Remote Shutdown Communication Cable Port Used to...

Страница 12: ...ion and serial number The nameplate is for reference only Indicator Status Description ON WiFi is connected active BLINK 1 WiFi system is resetting BLINK 2 WiFi not connect to the router BLINK 4 WiFi...

Страница 13: ...the supplier 3 Check the deliverables for correct model complete contents and intact appearance Contact the supplier as soon as possible if any damage is found Notice Number of expansion bolts spare...

Страница 14: ...age or throw the desiccant away 2 Store the equipment in a clean place Make sure the temperature and humidity are appropriate and no condensation 3 The height and direction of the stacking inverters s...

Страница 15: ...e surface to avoid burning 7 Install the equipment at a height that is convenient for operation and maintenance electrical connections and checking indicators and labels 8 The altitude to install the...

Страница 16: ...de down forward tilt back forward tilt or horizontally Mounting Support Requirements The mounting support shall be nonflammable and fireproof Make sure that the support surface is solid enough to bear...

Страница 17: ...Use other auxiliary tools on site if necessary Installation Tool Requirements Goggles Safety shoes Safety gloves Dust mask Diagonal pliers Marker Level Heat shrink tube Rubber hammer DC wiring wrench...

Страница 18: ...when moving the equipment NOTICE Avoid the water pipes and cables buried in the wall when drilling holes Wear goggles and a dust mask to prevent the dust from being inhaled or contacting eyes when dri...

Страница 19: ...e specifications shall meet local laws and regulations DANGER Disconnect the DC switch and the AC output switch of the inverter to power off the inverter before any electrical connections Do not work...

Страница 20: ...ring to the inverter Otherwise the inverter may be damaged permanently or even cause fire and cause personal and property losses 1 Make sure that the max short circuit current and the max input voltag...

Страница 21: ...used Otherwise the ingress protection rating will be influenced Click Step 1 Prepare DC cables Step 2 Crimp the crimp contacts Step 3 Disassemble the PV connectors Step 4 Make the DC cable and detect...

Страница 22: ...it detects any leak current over the permissible range An AC circuit breaker shall be installed on the AC side to make sure that the inverter can safely disconnect the grid when an exception happens...

Страница 23: ...curely Otherwise the terminal may be too hot to damage the inverter when the inverter is working Step 1 Make the AC output cable Step 2 Disassemble the AC connector Step 3 Insert the AC output cable i...

Страница 24: ...06 Electrical Connection 20 User Manual V1 0 2022 12 15 AC 1 or or AC 2 AC 3 Click AC 1 Connector Copper...

Страница 25: ...06 Electrical Connection 21 User Manual V1 0 2022 12 15 AC 2 Connector Copper AC 3 Connector Copper...

Страница 26: ...Limit Network The PV station generates power for self consumption but the electric equipment cannot consume all the generated power The inverter can monitor the on grid electric data in real time and...

Страница 27: ...s incompliance with Australian and New Zealand safety requirements Contat the after sales service to get the DRED terminal if you need to use DRED function DRED function is off by default Start this f...

Страница 28: ...06 Electrical Connection 24 User Manual V1 0 2022 12 15 CT Communication Cable RS485 Communication Cable 1 CT 2 CT 6 RS485 5 RS485 4 Reserved 3 Reserved 2 RS485 1 RS485...

Страница 29: ...information visit https en goodwe com Plug a communication module into the inverter to establish a connection between the inverter and the smartphone or web pages The communication module can be a WiF...

Страница 30: ...correctly and securely 3 Cable ties are intact routed properly and evenly 4 Unused ports and terminals are sealed 5 The voltage and frequency at the connection point meet the inverter grid connection...

Страница 31: ...eding power at the moment ON A fault has occurred OFF No fault Faulty Operating Power LCD Button Description This part describes the menu structure allowing you view inverter information and set param...

Страница 32: ...Short press Short press Short press Short press Short press Short press Short press Next page Short press to select 0 9 Short press to select 0 9 Short press to select 0 9 Short press to select 0 9 wa...

Страница 33: ...ess for 2s Long press for 2s Long press for 2s Long press for 2s Long press for 2s Long press for 2s Long press for 2s Long press for 2s Long press for 2s Wait Wait Wait Wait Short press Short press S...

Страница 34: ...time according to the actual time in the country region where the inverter is located W L Reset Power off and restart the WiFi module W L Reload Restore the factory settings of the WiFi module Reconfi...

Страница 35: ...n Italy only Short press the button until LCD displays Auto Test and long press the button to start this function if auto test is finished short press the button until LCD displays Auto Test Result an...

Страница 36: ...ing platform used to manage organizations users add plants and monitor plant status For more details refer to the SEMS Portal User Manual Scan the QR code or visit https en goodwe com Ftp EN Downloads...

Страница 37: ...unting plate Step 3 Remove the mounting plate Step 4 Store the inverter properly If the inverter needs to be used later ensure that the storage conditions meet the requirements 9 3 Disposing of the In...

Страница 38: ...econnect the PV panel and check the Inverter status 4 Contact local service office for help if the problem still persist Vac Failure 1 The PV Inverter will automatically restart within 5 minutes if th...

Страница 39: ...e office for help AFCI Fault 1 Turn off the DC switch of the inverter 2 Ensure the DC connector is the right model and is properly connected 3 Turn on the DC switch and make sure it is connected 4 If...

Страница 40: ...he Array A 0 0 0 0 0 0 Number of MPPT 2 2 2 2 2 2 Number of Strings per MPPT 1 1 1 1 1 1 Output Nominal Output Power W 2 3 2900 3000 3680 4200 5000 6000 Nominal Output Apparent Power VA 4 2900 3000 36...

Страница 41: ...on Integrated AC Overvoltage Protection Integrated DC Switch Optional DC Surge Protection Type III Type II Optional Type III Type III Type III Type III Type III AC Surge Protection Type III Emergency...

Страница 42: ...0 600 MPPT Operating Voltage Range V 80 550 80 550 80 550 80 550 80 550 MPPT Voltage Range at Nominal Power V 130 550 150 550 170 550 200 550 240 550 Start up Voltage V 80 80 80 80 80 Nominal Input Vo...

Страница 43: ...3 3 3 Maximum Output Overcurrent Protection A 42 42 42 42 50 Efficiency Max Efficiency 97 8 97 8 97 8 97 8 97 8 European Efficiency 97 5 97 5 97 5 97 5 97 5 Protection PV String Current Monitoring Int...

Страница 44: ...tegory DC II AC III Protective Class I The Decisive Voltage Class DVC PV C AC C Com A Active Anti islanding Method AFDPF AQDPF 6 Country of Manufacture For Australia only China Technical Data GW5KBD N...

Страница 45: ...ble from 0 8 leading to 0 8 lagging Max Total Harmonic Distortion 3 3 Maximum Output Overcurrent Protection A 42 50 Efficiency Max Efficiency 97 8 97 8 European Efficiency 97 5 97 5 Protection PV Stri...

Страница 46: ...t Power VA GW5000D NS is 4999 5 For Australia Max Operating Altitude m is 3000 6 AFDPF Active Frequency Drift with Positive Feedback AQDPF Active Q Drift with Positive Feedback Cooling Method Natural...

Страница 47: ...Official Website GoodWe Technologies Co Ltd No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com Contact Information...

Отзывы: