background image

36

Checking Static Pressure

Figure 40

3. Pressure drop in lines between regulators, and between second

stage regulator and the appliance. Pipe size will depend on
length of pipe run and total load of all appliances.

Complete information regarding tank sizing for vaporization, rec-
ommended regulator settings, and pipe sizing is available from
most regulator manufacturers and propane gas suppliers.

Since propane gas will quickly dissolve white lead and most standard commercial compounds, special pipe dope must be used. Pipe
dope used on propane gas installations must be approved for use with propane gas.

Refer to the Figure 39 for typical propane gas installations and piping.

C

IRCULATING

 A

IR

 & F

ILTERS

D

UCT

 

WORK

 - A

IR

 F

LOW

Duct systems and register sizes must be properly designed for the CFM and external static pressure rating of the furnace. Design the
ductwork in accordance with the recommended methods of  “Air Conditioning Contractors of America” Manual D.

Install the duct system in accordance with Standards of the National Board of Fire Underwriters for the Installation of Air Conditioning,
Warm Air Heating and Ventilating Systems. Pamphlets No. 90A and 90B.

A closed return duct system must be used, with the return duct connected to the furnace. 

NOTE:

  Ductwork must never be attached

to the back of the furnace.

 

 For upflow installations requiring 1800 CFM or more, use either two side returns or bottom return or a

combination of side and bottom. Flexible joints may be used for supply and return connections to reduce noise transmission. To
prevent the blower from interfering with combustion air or draft when a central return is used, a connecting duct must be installed
between the unit and the utility room wall.  Never use a room, closet, or alcove as a return air chamber.

C

HECKING

 D

UCT

 S

TATIC

Refer to your furnace rating plate for the maximum ESP (external duct static) rating.

Total external static refers to everything external to the furnace cabinet. Cooling coils, filters, ducts, grilles, registers must
all be considered when reading your total external static pressure. The supply duct pressure must be read between the
furnace and the cooling coil. This reading is usually taken by removing the “A” shaped block off plate from the end on the
coil; drilling a test hole in it and reinstalling the block off plate. Take a duct static reading at the test hole. Tape up the test
hole after your test is complete. The negative pressure must be read between the filter and the furnace blower.

Excessive external static pressure will result in insufficient air which
can cause excessive temperature rise. This can cause limit switch
tripping and heat exchanger failure.

To determine total external duct static pressure, proceed as follows;

1. With clean filters in the furnace, use a draft gauge (inclined ma-

nometer) to measure the static pressure of the return duct at the
inlet of the furnace. (Negative Pressure)

2. Measure the static pressure of the supply duct. (Positive Pres-

sure)

3. The difference between the two numbers is your total external

static pressure.

Example:

static reading from return duct = -0.1" W.C.

static reading from supply duct = +0.3" W.C.

total external static pressure on this system = 0.4" W.C.

N

EVER

 

ALLOW

 

THE

 

PRODUCTS

 

OF

 

COMBUSTION

INCLUDING

 

CARBON

 

MONOXIDE

TO

 

ENTER

 

THE

 

RETURN

 

DUCT

 

WORK

 

OR

 

CIRCULATION

 

AIR

 

SUPPLY

.

WARNING

Содержание xCVM97 Series

Страница 1: ...L AS A SAFETY PRECAUTION NOTE Please contact your distributor or our website for the applicable Specification Sheet referred to in this manual TABLE OF CONTENTS is a registered trademark of Maytag Cor...

Страница 2: ...GHT INSTALLATIONS 39 HORIZONTAL INSTALLATIONS 39 STARTUP PROCEDURE ADJUSTMENT 39 HEATING OPERATION WITH CTK01 THERMOSTAT COMMUNICATING 40 HEATING OPERATION WITH CTK02 CTK03 CTK04 THERMOSTAT MODULATING...

Страница 3: ...ER OPERATION OR DAMAGE TO EQUIPMENT IF THE FURNACE ENVIRONMENT HAS THE POTENTIAL OF FREEZING THE DRAIN TRAP AND DRAIN LINE MUST BE PROTECTED THE USE OF ACCESSORY DRAIN TRAP HEATERS ELECTRIC HEAT TAPE...

Страница 4: ...nsit In the event of damage the consignee should 1 Make a notation on delivery receipt of any visible damage to shipment or container 2 Notify carrier promptly and request an inspection 3 With conceal...

Страница 5: ...Net family of products The CTK family of thermostat kits allow this furnace to be installed as part of a digitally communicating system The ComfortNet system provides automatic airflow configuration e...

Страница 6: ...is dual certified Dual certification means that the combustion air inlet pipe is OPTIONAL and the furnace can be vented as a Non direct vent single pipe central forced air furnace in which combustion...

Страница 7: ...furnace with respect to the proposed or existing air distribution system Ensure the temperature of the return air entering the furnace is between 55 F and 100 F when the furnace is heating Provide pro...

Страница 8: ...B width furnace For upflow applications the front of the coil and furnace must face the same direction If the furnace is installed in a residential garage position the furnace so that the burners and...

Страница 9: ...riction leakage corrosion and other deficiencies which could cause an unsafe condition 3 As far as practical close all building doors and windows and all doors between the space in which the appliance...

Страница 10: ...des for determining the combustion air requirements for the appliances Most homes will require outside air be supplied to the furnace area by means of ventilation grilles or ducts connecting directly...

Страница 11: ...and 9 3 2 2 2 9 3 2 3 Indoor Opening Size and Location Openings used to connect indoor spaces shall be sized and located in accordance with the following 1 Combining spaces on the same story Each open...

Страница 12: ...t least 1 in 25 mm from the sides and back and 6 in 150 mm from the front of the appliance The opening shall directly commu nicate with the outdoors or shall communicate through a vertical or horizont...

Страница 13: ...n calculating the size opening required to provide the free area specified Where the louver and grille design and free area are not known it shall be assumed that wood louvers will have 25 percent fre...

Страница 14: ...he furnace Refer to Recommended Installation Positions figure for appropriate installation positions ductwork connections and resulting airflow arrangements HORIZONTAL APPLICATIONS CONSIDERATIONS When...

Страница 15: ...uperator coil front cover ALTERNATE ELECTRICAL AND GAS LINE CONNECTIONS This furnace has provisions allowing for electrical and gas line connections through either side panel In horizontal application...

Страница 16: ...ions must be used Fittings must be DWV type fittings meetingASTM D2665 andASTM D3311 Carefully follow the pipe manufacturer s instructions for cutting cleaning and solvent cementing of PVC The use of...

Страница 17: ...ropriate location of vent flue pipe and combustion air intake pipe when applicable terminations Refer to Non Direct Vent Single Pipe Piping and Direct Vent Dual Pipe Piping located in this section for...

Страница 18: ...hanical air supply inlet to building or the combustion air inlet to any other appliance 6 in 15 cm for appliances 10 000 Btuh 3 kW 12 in 30 cm for appliances 10 000 Btuh 3kW and 100 000 Btuh 30 kW 36...

Страница 19: ...e outlet is sized to accept 2 pipe Secure vent flue pipe directly into the furnace fitting with the appropriate glue Alternately a small section of 2 pipe may be glued in the furnace socket and a rubb...

Страница 20: ...p 2 secure with clamps 7 Secure flange to cabinet using screws removed in step 1 ALTERNATE COMBUSTION AIR PROVISION Upflow Horizontal models only When using the alternate venting location either in a...

Страница 21: ...elbow is used for termination it must be pointed downward The vent flue pipe may terminate vertically as through a roof or horizontally as through an outside wall Vertical vent flue pipe terminations...

Страница 22: ...d Use 1 2 thickclosedcellfoaminsulationsuchasArmaflex orInsultube where required Vent Combustion Air Intake Measurements for Standard Hori zontal Terminations Dual Pipe Center to center 10 min 24 max...

Страница 23: ...ocal and national codes Followthebulletslistedbelowwheninstallingthedrainsystem Refertothefollowingsectionsforspecificdetailsconcerningfurnace drain trap installation and drain hose hook ups The drain...

Страница 24: ...22 2 Locate the long drain hose 3 and cut at line A 3 Install large end of hose 3 to trap outlet and secure with 1 25 clamp 4 Install smaller end of hose 3 on 45 elbow and secure with 1 clamp 5 Refer...

Страница 25: ...e cabinet 8 Refer to Field Supplied Drain section for instructions on field supplied installed drain on outlet of furnace trap UPFLOW MODEL INSTALLED HORIZONTALLY WITH LEFT SIDE DOWN Minimum 5 1 2 cle...

Страница 26: ...rap to outside the cabinet DRAIN EXITING LEFT SIDE 1 Install a field supplied rubber coupling secured with a 1 1 4 clamp to enable removing the trap for future cleaning Alternately a PVC fitting may b...

Страница 27: ...stall in blower deck 4 Draining the Collector Box Locate hose 4 and place the radius end on the collector box drain port secure with a silver clamp 5 Locate hose 2 insert from outside the cabinet in t...

Страница 28: ...the wiring diagram located on the unit s blower door For direct vent applications the cabinet opening to the junction box must be sealed air tight using either an UL approved bushing such as Heyco Li...

Страница 29: ...oling ramping profiles and dehum feature re quires a jumper between Y1 and O when a straight cooling unit is used The auxiliary contacts are shipped with a factory installed jumper As an option the au...

Страница 30: ...Secure the dehumidistat ground wire typically the green lead to the ground screw on the furnace junction box NOTE Ground wire may not be present on all dehumidistats 5 If the condenser is a straight...

Страница 31: ...er may be connected between one of the HUM con tacts and NEUTRAL The other HUM contact must be fed from the L1 terminal Allfieldwiringmustconformtoapplicablecodes Connectionsshouldbemadeasshown in Fig...

Страница 32: ...as and length of the run The gas line installation must comply with local codes or in their absence with the latest edition of the National Fuel Gas Code NFPA 54 ANSI Z223 1 or CAN CSA B149 1 in Canad...

Страница 33: ...ten all joints securely Connection method must be in compliance with all local and national codes US National Fuel Gas Code NFGC NFPA 54 2012 ANSI Z223 1 2012 and the Installation Standards Warm Air H...

Страница 34: ...ide chosen location of union and cabinet width The union may be placed inside or outside of the cabinet GAS PIPING CHECKS Before placing unit in operation leak test the unit and gas connections Check...

Страница 35: ...REAS OR CONFINED SPACES PROPANE GAS ODORANT MAY FADE MAKING THE GAS UNDETECTABLE EXCEPT WITH A WARNING DEVICE WARNING 200 PSIG Maximum 5 to 15 PSIG 20 PSIG Max Continuous 11 W C Second Stage Regulator...

Страница 36: ...ng with combustion air or draft when a central return is used a connecting duct must be installed between the unit and the utility room wall Never use a room closet or alcove as a return air chamber C...

Страница 37: ...ace and if manually operated must be equipped with means to prevent operation of either unit unless the damper is in the full heat or cool position When the furnace is installed without a cooling coil...

Страница 38: ...our distributor for information on our complete line of IAQ Clean Comfort products Air cleaner installation location Maximum Heating Airflow Filter Media Dimensions Part Number Air Cleaner Family Side...

Страница 39: ...nace control board will follow the conventional 2 Stage algorithm equivalent to a W2 request and be reflected in the heat current demand status The circulator will operate per the heat airflow profile...

Страница 40: ...is sent the furnace will go through the Light Off Sequence at which time the Heat Current Demand Status will still show 0 After the successful Light Off Sequence and expiration of the Ignition Stabil...

Страница 41: ...lectrical power to the furnace 3 Set the room thermostat to the lowest possible setting 4 Remove the burner compartment door NOTE This furnace is equipped with an ignition device which automatically l...

Страница 42: ...urnace gas supply pressure with burners firing Supply pressure must be within the range specified in the Inlet Gas Supply Pressure table Natural Gas Minimum 4 5 w c Maximum 10 0 w c Propane Gas Minimu...

Страница 43: ...ty thread sealer 12 Turn on electrical power and gas supply to the system 13 Close thermostat contacts R and W1 W2 to energize the valve Using an approved liquid gas leak detector solution check for l...

Страница 44: ...re and Adjustment Circulator Blower Speeds for speed changing details CIRCULATOR BLOWER SPEEDS TO AVOID PERSONAL INJURY OR DEATH DUE TO ELECTRICAL SHOCK TURN OFF POWER TO THE FURNACE BEFORE CHANGING S...

Страница 45: ...e dual 7 segment LED display 6 The multi speed circulator blower also offers several custom ON OFF ramping profiles for cooling These profiles may be used to enhance cooling performance and increase c...

Страница 46: ...l module The delay is factory shipped at 150 seconds but may be changed to suit the installation requirements and or homeowner preference Refer to the DIP switch chart in the back section of this manu...

Страница 47: ...econds ON ON 1 Stage Stat OFF 2 Stage Stat ON 1 Stage Compressor OFF 2 Stage Compressor ON Disabled OFF Enabled ON Disabled OFF Enabled ON Disabled OFF Enabled ON Disabled OFF Enabled ON Not applicabl...

Страница 48: ...de mand The air conditioner will then send a fan request along with the low stage cooling airflow demand to the furnace Once received the furnace will send the low stage cooling airflow demand to the...

Страница 49: ...be utilized between the indoor and out door units For this wiring scheme only the data lines 1 and 2 are needed between the indoor and outdoor units A40VA 208 230 VAC to 24VAC transformer must be inst...

Страница 50: ...s and the corresponding potential problem Learn button Used to reset the network Depress the button for approximately 2 seconds to reset the network SYSTEM TROUBLESHOOTING NOTE Refer to the instructio...

Страница 51: ...cause the gas valve to modulate higher The burner will modulate based on the inducer speed Circulator blower is energized on heat speed following a thirty 30 second blower on delay The circulator blo...

Страница 52: ...ames should be inspected with the burner compartment door installed Flames should be stable quiet soft and blue dust may cause orange tips but they must notbeyellow Flamesshouldextenddirectlyoutwardfr...

Страница 53: ...s hand during grounding will be discharged 3 Service integrated control module or connecting wiring following the discharge process in step 2 Use caution not to recharge your body with static electric...

Страница 54: ...ilter maintenance is the most common cause of inad equate heating or cooling performance Filters should be cleaned permanent or replaced disposable every two months or as re quired When replacing a fi...

Страница 55: ...using emery cloth or steel wool Following cleaning the flame sense signal should be as indicated in the Specifications Sheet BEFORE LEAVING AN INSTALLATION Cycle the furnace with the thermostat at lea...

Страница 56: ...stage pressure switch circuit is closed at start of heating cycle PS1 CLOSED E1 Low stage pressure switch contacts sticking Shorts in pressure switch circuit wiring Replace low stage pressure switch...

Страница 57: ...aux out Missing jumper Open float switch Install jumper Inspect float switch Turn power OFF prior to repair No furnace operation Integrated control module LED display provides E5 error code ComfortNet...

Страница 58: ...t thermostat Call for Service icon illuminated ComfortNet thermostat scrolls Check Furnace message EA Polarity of 1 1 5 volt AC is reversed REVERSED PLTY EA Polarity of 1 1 5 volt AC power to furnace...

Страница 59: ...a set in integrated control module Verify circulator blower motor horse power is the same specified for the specific furnace model Replace if necessary Verify shared data set is correct for the specif...

Страница 60: ...ct Description and Location Requirements Considerations for furnace installation requirements Turn power OFF prior to repair Furnace fails to operate Integrated control module LED display provides b7...

Страница 61: ...MORY CARD DATA dF DEFROST DEMAND E0 LOCKOUT DUE TO EXCESSIVE RETRIES OR RECYCLES E1 LOW STAGE PRESSURE SWITCH STUCK CLOSED AT START OF HEATING CYCLE E2 LOW STAGE PRESSURE SWITCH STUCK OPEN E3 OPEN HIG...

Страница 62: ...NG TO UNIT MUST BE TO UNIT MUST BE PROPERLY POLARIZED EQUIPMENT GND FIELD SPLICE SWITCH TEMP SWITCH PRESSURE PROT DEVICE LOW VOLTAGE FIELD LOW VOLTAGE 24V HI VOLTAGE 115V HI VOLTAGE FIELD INTERNAL TO...

Страница 63: ...e no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment...

Страница 64: ...ompany L P 5151 San Felipe Suite 500 Houston TX 77056 www goodmanmfg com www amana hac com NOTE SPECIFICATIONS AND PERFORMANCE DATA LISTED HEREIN ARE SUBJECT TO CHANGE WITHOUT NOTICE 2014 2015 Goodman...

Отзывы: