Goldtop 14-200 Скачать руководство пользователя страница 1

INSTRUCTIONS TO INSTALL  
GOLDTOP 

14-200, 14-256 AND 14-256-1 REBUILD KIT 

 
Disassembly 

 

 

i.

Using the T-55 Torx bit provided, remove the friction plate. The threads are left 

hand - turn the T-55 Torx bit 

counter clockwise 

while holding the friction plate 

from rotating. It will help to apply air pressure to the clutch while removing the 

friction plate.  

ii.

Once the friction plate is removed, hand-tighten the aluminum cage on the left 

hand threaded bolt. If you applied air pressure in step one remove it now.  

iii.

Remove the lining screws with the T-27 Torx bit provided. Remove the lining.  

iv.

Remove the Aluminum Spring Housing. Use two flat screwdrivers to carefully pry 

the Aluminum Spring Housing from the pulley.  

v.

Remove the large rubber seal and wipe the area clean.  

vi.

Remove the retaining clip. Remove the Air Chamber Cap. Remove the Snap 

Ring.   Remove the air chamber assembly. Clean the inside of the shaft.  

vii.

Remove the bearing nut with a 2" socket.  

viii.

The pulley will now slide off the shaft. Press out the bearings and save any 

spacers between the bearings.  

 
Installation 

 

 

i.

Press in the two new bearings into the pulley (if there were spacers between 

bearings in the pulley, reuse them)  

ii.

Install sheave over the journal bracket  

iii.

Install the bearing nut. Torque to 125 Ft. Lbs.  

iv.

Apply o-ring lube to the three o-rings on the air cartridge assembly and install the 

new air cartridge assembly in the journal bracket  

v.

Install the new snap ring over air cartridge assembly  

vi.

Align the 8 holes in the Gold Top ä with the 8 holes in the pulley. Torque the 8 T-

27 screws to 80 Inch-Lbs  

Patent(s) Pending 

Exploded View and Part Description 

 

Page 1 of 2

Kit Masters

Отзывы: