德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co. Ltd
.
电话
Tel
:
010
-
69596333
北京市通州区宋庄
Songzhuang Tongzhou District Beijing 101118
德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co., Ltd.
9.2.3.5. Operation specifications for phase cables and related parts replacement:
1. Steps: see the diagram (Figure 6)
Step 1: Use a ratchet wrench to remove the 8 hex flange bolts fixed on the phase cover, check whether the screw
threads are damaged and severely rusted, and replace if necessary.
Step 2: Remove the cover and check whether foreign matter entered junction box. If there is, remove it .
(wet tools prohibited).
Step 3: Check whether the cover of the junction box is deformed and replace it if necessary.
Step 4: Use a hexagonal wrench to remove the 6 screws assembly which fix the phase cable, check the screw
threads for damage and serious corrosion, and replace if necessary.
Step 5: Use a cable socket wrench to remove the cable gland cover, remove the cables that need to be replaced, and
then remove the cable gland base.
Step 6: Use a cable socket wrench to install the new cable gland base to the junction box with a torque of 25Nm.
Step 7: Install the new cable to the junction box, and tighten the screw (HW-2316) with a torque of 20Nm.
Step 8: Use a cable socket wrench to fasten the cable gland cover on the new cable with a torque of 12Nm.
Step 9: Install the seal ring opening upward to the junction box, as shown in the figure (7).
Step 10: Use a fixed-value torque wrench to install the cover on the junction box with 8 hexagon flange bolts. The
tightening torque is 9 ± 1Nm. Before installation, check whether there is any foreign matter in the junction
box again, and the treatment method is the same as step 2.
Step 11: After the replacement is completed, perform an insulation test on the motor. Use an insulation resistance
meter by 500Vdc or 1000Vdc voltage range. The positive test lead touches each phase of the motor, and
the negative test lead touches the frame. Press the test button, wait for the value to stabilize and record it.
Figure (6) Figure (7)
2.Tools for use:
Fixed value torque wrench 0-10Nm, outer hexagon wrench, ratchet wrench, 10mm sleeve, special socket wrench
for cable, insulation resistance meter
3. List of maintenance parts:
No.
Part number of
maintenance part
Name of maintenance
part
Quantit
y per
unit
Maintenance part replacement
standard
2-62
Содержание XML6125CLE
Страница 1: ......
Страница 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Страница 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Страница 26: ......
Страница 126: ......
Страница 130: ...PP 4 Propeller shaft 1 传动轴 Drive shaft 2 六角螺栓 Hex bolt 3 螺母 Nut 4 弹垫 Spring washer 5 万向节总成 Universal joint assy 3 4 ...
Страница 137: ......
Страница 138: ...Repair Instructions AVN 75 RL 75 A RL 75 E RL 75 EC RL 80 A RL 80 E RL 82 A RL 82 EC RL 85 A RL 85 E RL 85 EC Buses 4 1 ...
Страница 255: ...4 118 ...
Страница 256: ...4 119 ...
Страница 258: ......
Страница 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Страница 340: ......
Страница 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Страница 357: ......
Страница 404: ......
Страница 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Страница 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Страница 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Страница 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Страница 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Страница 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Страница 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Страница 487: ......
Страница 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Страница 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Страница 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Страница 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Страница 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Страница 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Страница 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Страница 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Страница 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Страница 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Страница 577: ...11 1 ...
Страница 580: ...11 4 ...
Страница 581: ...11 5 ...
Страница 582: ...11 6 ...
Страница 583: ...11 7 ...
Страница 584: ...11 8 ...
Страница 585: ...11 9 ...
Страница 586: ...11 10 ...
Страница 587: ...11 11 ...
Страница 588: ...11 12 ...
Страница 589: ...11 13 ...
Страница 590: ... 11 14 ...
Страница 591: ...11 15 ...
Страница 593: ...11 17 ...
Страница 595: ...11 19 ...
Страница 597: ...GOLDEN DRAGON A 11 21 ...
Страница 599: ...11 23 ...
Страница 600: ...11 24 ...
Страница 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Страница 602: ...11 26 ...
Страница 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Страница 604: ...11 28 ...
Страница 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Страница 606: ...11 30 ...
Страница 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Страница 608: ...11 32 ...
Страница 609: ...11 33 ...
Страница 610: ...11 34 ...
Страница 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Страница 612: ...11 36 ...
Страница 613: ...Air outlet 3 8 11 37 ...