德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co. Ltd
.
电话
Tel
:
010
-
69596333
北京市通州区宋庄
Songzhuang Tongzhou District Beijing 101118
德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co., Ltd.
12.E-drive system service tools
12.1. List of tools:
No.
Tool name
Quantity Unit Purpose
Remarks
1
Air gun
1
pcs For matching Phillips screwdrivers or sleeves
2
Diagonal pliers
1
pcs For cutting straps
3
Hexagon wrench
1
Set
Used to remove the motor side phase cable bolts;
For removing DC bus bolts of MCU
4
Needle-nose pliers
1
pcs
pcs
For picking up motor side phase cable bolts
For picking up DC bus bolts of motor controllers
5
Magnetic picker
1
pcs
pcs
Used to suck the motor side phase cable bolt
For sucking DC bus bolts of motor controller
6
Phillips screwdriver
1
pcs
Used to remove the VMU screws
7
Open end wrench
1
Set
Used to remove flange bolts of suspension cushions
M6-M24
For removing the motor output shaft flange and drive
shaft flange bolts
For removing the motor frame suspension mounting
bolts (associated with the frame)
8
Sockets
1
Set
For removing the motor output shaft flange and drive
shaft flange nut
M6-M24
For removing the motor frame suspension mounting
bolts (associated with the frame)
9
Sockets
1
pcs For removing the DC bus plug of the motor controller
M36
10
Sockets
1
pcs For removing spline flange fastening nuts
M50
11
Extractor
1
pcs Used to disassemble motor end resolver pins
12
Lappgroup tools
1
Set For removing the motor side phase cable and gland
52017010-M25*1.5
13
Percussion spanner
1
pcs For disassembly of DC bus waterproof connector
machine to M34
14
Multimeter
1
Set Used to measure Can line voltage and other
15
Megameter
1
Set Used to test the insulation of e-drive systems
16
Torque wrench
1
pcs For installing phase cables to confirm torque
5-25Nm
17
Torque wrench
1
pcs For mounting the bulge flange to the torque
20-100Nm
18
Torque wrench
1
pcs For mounting spline flanges to confirm torque
40-200Nm
19
Single-arm crane
1
Unit For transfer motors
Use of disassembly
motor
20 Mobile hydraulic lift
4
Unit For lifting the entire vehicle
Use of disassembly
motor
21
Hydraulic lifting
trolley
2
Unit For supporting motors and power battery packs
Max. stroke 1.5M
2-95
Содержание XML6125CLE
Страница 1: ......
Страница 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Страница 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Страница 26: ......
Страница 126: ......
Страница 130: ...PP 4 Propeller shaft 1 传动轴 Drive shaft 2 六角螺栓 Hex bolt 3 螺母 Nut 4 弹垫 Spring washer 5 万向节总成 Universal joint assy 3 4 ...
Страница 137: ......
Страница 138: ...Repair Instructions AVN 75 RL 75 A RL 75 E RL 75 EC RL 80 A RL 80 E RL 82 A RL 82 EC RL 85 A RL 85 E RL 85 EC Buses 4 1 ...
Страница 255: ...4 118 ...
Страница 256: ...4 119 ...
Страница 258: ......
Страница 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Страница 340: ......
Страница 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Страница 357: ......
Страница 404: ......
Страница 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Страница 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Страница 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Страница 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Страница 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Страница 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Страница 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Страница 487: ......
Страница 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Страница 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Страница 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Страница 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Страница 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Страница 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Страница 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Страница 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Страница 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Страница 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Страница 577: ...11 1 ...
Страница 580: ...11 4 ...
Страница 581: ...11 5 ...
Страница 582: ...11 6 ...
Страница 583: ...11 7 ...
Страница 584: ...11 8 ...
Страница 585: ...11 9 ...
Страница 586: ...11 10 ...
Страница 587: ...11 11 ...
Страница 588: ...11 12 ...
Страница 589: ...11 13 ...
Страница 590: ... 11 14 ...
Страница 591: ...11 15 ...
Страница 593: ...11 17 ...
Страница 595: ...11 19 ...
Страница 597: ...GOLDEN DRAGON A 11 21 ...
Страница 599: ...11 23 ...
Страница 600: ...11 24 ...
Страница 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Страница 602: ...11 26 ...
Страница 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Страница 604: ...11 28 ...
Страница 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Страница 606: ...11 30 ...
Страница 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Страница 608: ...11 32 ...
Страница 609: ...11 33 ...
Страница 610: ...11 34 ...
Страница 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Страница 612: ...11 36 ...
Страница 613: ...Air outlet 3 8 11 37 ...