德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co. Ltd
.
电话
Tel
:
010
-
69596333
北京市通州区宋庄
Songzhuang Tongzhou District Beijing 101118
德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co., Ltd.
11.2. MCU maintenance items
No.
Maintenance
content
Technical requirements
Tool
Operation specification
Maintenance interval
1
Appearance
The whole machine is
complete, no signs of
collision and damage
Visual inspection
Visually inspect the machine
appearance If it is damaged,
it needs to be replaced .
Every 50,000 KM
The connection of the high
and low voltage wiring
harness is dry, free of dust,
and no signs of overheating
and discoloration
Brushes and
vacuum cleaners
Visual inspection
Visually inspect the wiring
harness for signs of
overheating or discoloration.
If so, contact a professional
manufacturer for judgment.
Every 50,000 KM
No foreign matter and
impurities around the air
valve
Brushes and
vacuum cleaners
Use a brush or vacuum
cleaner to clean the surface,
remove the dust, impurities
and foreign matter, etc.
Every 50,000 KM
2
Installation
The MCU body and the
frame are firmly installed,
and the torque value meets
the design requirements of
the vehicle manufacturer
Torque wrench
and sleeve /
hexagonal
combination kit
Use tools, review and adjust
and tighten according to the
design requirements of the
vehicle manufacturer
Every 20,000 KM
No signs of aging, cracking
and crushing
Visual inspection
Every 20,000 KM
11.3. Vehicle controller maintenance items
No.
Maintenance
content
Technical requirements
Tool
Operation specification
Maintenance
interval
1
Appearance
The whole machine is
complete, no signs of
collision and damage
Visual inspection
Visually inspect the machine
appearance. If it is damaged,
it needs to be replaced when
it affects performance.
Every 20,000 KM
The connection and plug of
the whole machine's wiring
harness are dry and dust-
free
Brushes and
vacuum cleaners
Use a brush or vacuum cleaner to
clean the surface, remove the
surface gray layer, impurities and
foreign matter, etc.
Every 20,000
KM
2
Installation
The VMU body and the
frame are firmly installed,
and the torque value meets
the design requirements of
the vehicle manufacturer
Torque wrench
and sleeve /
hexagonal
combination kit
Cooperate with corresponding
tools, review and tighten according
to the design requirements of the
vehicle manufacturer
Every 20,000
KM
2-88
Содержание XML6125CLE
Страница 1: ......
Страница 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Страница 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Страница 26: ......
Страница 126: ......
Страница 130: ...PP 4 Propeller shaft 1 传动轴 Drive shaft 2 六角螺栓 Hex bolt 3 螺母 Nut 4 弹垫 Spring washer 5 万向节总成 Universal joint assy 3 4 ...
Страница 137: ......
Страница 138: ...Repair Instructions AVN 75 RL 75 A RL 75 E RL 75 EC RL 80 A RL 80 E RL 82 A RL 82 EC RL 85 A RL 85 E RL 85 EC Buses 4 1 ...
Страница 255: ...4 118 ...
Страница 256: ...4 119 ...
Страница 258: ......
Страница 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Страница 340: ......
Страница 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Страница 357: ......
Страница 404: ......
Страница 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Страница 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Страница 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Страница 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Страница 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Страница 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Страница 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Страница 487: ......
Страница 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Страница 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Страница 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Страница 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Страница 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Страница 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Страница 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Страница 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Страница 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Страница 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Страница 577: ...11 1 ...
Страница 580: ...11 4 ...
Страница 581: ...11 5 ...
Страница 582: ...11 6 ...
Страница 583: ...11 7 ...
Страница 584: ...11 8 ...
Страница 585: ...11 9 ...
Страница 586: ...11 10 ...
Страница 587: ...11 11 ...
Страница 588: ...11 12 ...
Страница 589: ...11 13 ...
Страница 590: ... 11 14 ...
Страница 591: ...11 15 ...
Страница 593: ...11 17 ...
Страница 595: ...11 19 ...
Страница 597: ...GOLDEN DRAGON A 11 21 ...
Страница 599: ...11 23 ...
Страница 600: ...11 24 ...
Страница 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Страница 602: ...11 26 ...
Страница 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Страница 604: ...11 28 ...
Страница 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Страница 606: ...11 30 ...
Страница 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Страница 608: ...11 32 ...
Страница 609: ...11 33 ...
Страница 610: ...11 34 ...
Страница 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Страница 612: ...11 36 ...
Страница 613: ...Air outlet 3 8 11 37 ...