德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co. Ltd
.
电话
Tel
:
010
-
69596333
北京市通州区宋庄
Songzhuang Tongzhou District Beijing 101118
德纳(北京)电机有限公司
Dana (Beijing) Electric Motor Co., Ltd.
Step 3: Use an external hex wrench to remove the three HW-2227 combination screws of the phase terminal;
Step 4: Use a special tool for removing the phase cable, loosen the phase cable gland and the fixed base, and remove
the phase cable.
Step 5: Use a special tool for removing the phase cable, loosen the connection between the phase cable gland base ,
and remove the phase cable base.
Step 6: Check whether foreign matter has entered the controller cavity when removing the phase cable;
Step 7: Follow steps 3-6 to complete the removal process of 3 phase cables.
10.3.2.1.2. Installation of phase cables
Step 1: Check the appearance of the phase cable. The surface should be free from damage, no rust on the surface of
the lug, and no surface corrosion.
Step 2: Remove the cable fixing base connected to the housing from the cable line, and then apply a small amount of
FN-0088 grease evenly on the surface of the fixed O-ring.
Step 3: Manually screw the cable fixing base into the threaded hole of the controller housing, and check that the O-
ring should not be damaged during the screwing.
Step 4: Use the special tool of Glan head to tighten the cable fixing base to ensure the tightening torque 25 ± 3Nm
Step 5: Take 1 cable, pass through the cable fixing base, insert the lug into the controller, and then use a hexwrench
to attach a HW-2227 combination screw that fixes the lug
Step 6: Use a torque wrench to tighten one HW-2227 flat disc combination screw to ensure a tightening torque of
9Nm
Step 7: Tighten the cable gland and base, tightening torque 12 ± 2Nm
Step 8: Repeat steps 1-7 to complete the installation of the remaining two cables.
Step 9: Check whether any foreign matter in the phase end enters the controller cavity;
Step 10: If the stuffing cap is deformed and the sealing gasket is damaged, replace it with a new stuffing cap.
Step 11: Manually screw the stuffing cover into the threaded hole of the controller casing. During the screwing
process, check that the O-ring should not be damaged.
10.3.2.1.3. Steps for removing positive and negative cables: see the diagram (Figure 1)
Step 1: Use a socket wrench to remove the eight HW-3144 hexagon sleeve flat head cap screws fixed on the DC DC
side cover;
Step 2: Check that the surface of the DC DC side cover is free of scratches, breakage, and deformation;
Step 3: Using a hexwrench, loosen the four HW-2102 combination screws fixed by the positive cable lug;
Step 4: Use the Glan head special wrench to loosen the connection thread between the positive cable gland and the
base, and then remove the positive cable;
Step 5: Remove the negative cable according to steps 3-4.
Step 6: Use the Glan head special wrench to remove the cable fixing base from the controller housing;
Step 7: Check the inside of the controller from the installation position of the DC DC side cover. No foreign objects
or screws should fall into the controller.
Note: Before removing the positive and negative cables, the positive and negative ends of the battery must be
removed first, and they cannot be removed in a charged state.
2-83
Содержание XML6125CLE
Страница 1: ......
Страница 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Страница 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Страница 26: ......
Страница 126: ......
Страница 130: ...PP 4 Propeller shaft 1 传动轴 Drive shaft 2 六角螺栓 Hex bolt 3 螺母 Nut 4 弹垫 Spring washer 5 万向节总成 Universal joint assy 3 4 ...
Страница 137: ......
Страница 138: ...Repair Instructions AVN 75 RL 75 A RL 75 E RL 75 EC RL 80 A RL 80 E RL 82 A RL 82 EC RL 85 A RL 85 E RL 85 EC Buses 4 1 ...
Страница 255: ...4 118 ...
Страница 256: ...4 119 ...
Страница 258: ......
Страница 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Страница 340: ......
Страница 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Страница 357: ......
Страница 404: ......
Страница 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Страница 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Страница 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Страница 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Страница 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Страница 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Страница 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Страница 487: ......
Страница 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Страница 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Страница 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Страница 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Страница 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Страница 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Страница 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Страница 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Страница 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Страница 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Страница 577: ...11 1 ...
Страница 580: ...11 4 ...
Страница 581: ...11 5 ...
Страница 582: ...11 6 ...
Страница 583: ...11 7 ...
Страница 584: ...11 8 ...
Страница 585: ...11 9 ...
Страница 586: ...11 10 ...
Страница 587: ...11 11 ...
Страница 588: ...11 12 ...
Страница 589: ...11 13 ...
Страница 590: ... 11 14 ...
Страница 591: ...11 15 ...
Страница 593: ...11 17 ...
Страница 595: ...11 19 ...
Страница 597: ...GOLDEN DRAGON A 11 21 ...
Страница 599: ...11 23 ...
Страница 600: ...11 24 ...
Страница 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Страница 602: ...11 26 ...
Страница 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Страница 604: ...11 28 ...
Страница 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Страница 606: ...11 30 ...
Страница 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Страница 608: ...11 32 ...
Страница 609: ...11 33 ...
Страница 610: ...11 34 ...
Страница 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Страница 612: ...11 36 ...
Страница 613: ...Air outlet 3 8 11 37 ...