FEATURES AND REQUIREMENTS 

 

1.1

 

THE 3010 ¾” VALVE 

,  

 

The 3010 ¾” valve is a two speed mechanical valve with the following features: 

pump flow : 12-23 l/min 

pressure range 12-50 bar 

oil temperature range : 10 

– 70°c 

 

1.2

 

THE FLUID 

 

 

GMV

 use and recommend an hydraulic fluid that : 

Thanks to classification as ISO-L-HFDU category according to ISO 6743-4 and 
its biodegradability index > 70%, according to standard OECD 301 B, is 
acceptable from an environmental point of view. 

Thanks to the synthetic base and its viscosity index (>180), higher than the 
traditional mineral oil, allowing greater stability, ensuring better performance 
against wear and aging on systems as lifts for persons and goods, in 
accordance with the environmental directive 2006/118/EC. 

Thanks to a flash point above 300°C compared to the 140°C of the traditional 
mineral oil it is safer and reduces the risk of fire. 

 

2

 

INSTALLATION OPERATIONS 

 

 

WARNING 

During installation operations never disable safety devices or directly power the pump motor.

 

 

2.1

 

HYDRAULIC  CONNECTIONS

 

Before starting the installation, you should verify the structural and spatial limits within which you will 
work. Consider the mounting methods you are going to use. It is therefore advisable to consider in 
advance all conditions affecting the different working procedures and therefore do not take any action 
without first considering the consequences. Make sure that the products received are complete with 
everything you need and that all products and parts are not damaged during transport. 

Data written on the label should be compared with the order form. 

During the storage period, keep the material in the original container, protected from weather and direct 
sun exposure, in order to prevent accumulation of water / condensation which may occur inside the 
package. (See Technical data for the range of temperature and humidity). After removing the product, 
the packaging material must be properly disposed of, as required by local law. Before recycling should 
verify the nature of the various materials and recycle as prescribed. 

GMV is not responsible for any damages caused by manual modifications (or changes) of the 
packaging material done by others. 

Any use of the facility, which is different from the original proposal situation should be discussed with 
GMV. An application or use not permitted by GMV (patent legal reasons, technical or otherwise) is 
under the installer responsibility and may affect the warranty. 

For the installation or replacement of the hydraulic system components, observe the following points 

Always place the elevator on the puffers; 

Make sure the elevator cannot operate accidentally, blocking the main electrical switch; 

Before opening any part of the hydraulic circuit, remove or unscrew the caps is always necessary to 
bring the oil pressure to zero. 

In case of welding operations,be care to prevent any contact between the oil and the piston rod, its 
seals and other resilient parts that could be damaged; 

Содержание 3010

Страница 1: ...ND COMPONENTS FOR LIFTS UNI EN ISO 9001 Certified Company 1 01 ENG English 3010 VALVE SELL TECH WORK CUST USER 3010 VALVE MANUAL INSTALLATION USE AND MAINTENANCE 1 0991 497 EN AVAILABLE WITH TANK TYPE HL HL DRY HL 50 DRY HLV HLV 40 e GL ...

Страница 2: ...3 3 ADJUSTMENT OF THE UPWARD ACCELERATION N 4 10 3 4 ADJUSTMENT OF SLOW LEVELLING SPEED N 2 10 3 5 ADJUSTMENT OF THE UPWARD HIGH SPEED N 8 10 3 6 ADJUSTMENT OF THE DOWNWARD ACCELERATION N 7 10 3 7 ADJUSTMENT OF THE DOWNWARD HIGH SPEED N 9 10 3 8 ADJUSTMENT OF THE UPWARD AND DOWNWARD DECELERATION N 3 10 3 9 PIPE RUPTURE VALVE VC TEST IN THE VALVE BLOCK N 5 11 3 10 ADJUSTMENT OF THE MINIMUM RAM PRES...

Страница 3: ...ressure adjustment 7 Downward start adjustment 8 High speed adjustment 9 Down speed compensator empty full load 10 Hand pump max pressure adjustment 11 Minimum upward pressure adjustment RUB Shut off valve for pressure gauge exclusion MAN Pressure gauge MM Manual lowering button PAM Hand pump V Hand pump air purge screw VP Pilot valve CHK Check valve VMD Downward solenoid valve VML Jump speed sole...

Страница 4: ...the documentation shouldn t be damaged and shouldn t have missing parts Moreover do not tear or deteriorate sheets during consulting 0 3 SAFETY PRECAUTION DURING INSTALLATION WARNING Before starting all kind of installation operation ALWAYS verify that all the safety devices mechanical or electrical are active and working properly 0 4 TOOLING Use standard building yard tooling for the installation...

Страница 5: ...LATION In these instructions the major points concerning the safety and prevention will be marked with the following symbols General warning Warning high risk of danger Risk of injury e g crushing sharp edges protrusions etc Warning risk of electrical damage exposed parts Beyond the instruction manual it should take into account national standards laws regulations and other rules on accident preve...

Страница 6: ...ting the different working procedures and therefore do not take any action without first considering the consequences Make sure that the products received are complete with everything you need and that all products and parts are not damaged during transport Data written on the label should be compared with the order form During the storage period keep the material in the original container protect...

Страница 7: ...Screw for rupture valve test EN 81 20 6 Minimum ram pressure adjustment 7 Downward start adjustment 8 High speed adjustment 9 Down speed compensator empty full load 10 Hand pump max pressure adjustment 11 Minimum upward pressure adjustment RUB Shut off valve for pressure gauge exclusion MAN Pressure gauge MM Manual lowering button PAM Hand pump V Hand pump air purge screw VP Pilot valve CHK Check ...

Страница 8: ... all electrical power by opening the main switch Power wires must be of sufficient section to support the required current and appropriate insulation for the voltage of the mains Wires must not come in contact with hot parts The ground wire should always be connected to the screw marked with the appropriate symbol 2 6 CONNECTION BOX Power units with immersed motor have the motor connection box loc...

Страница 9: ...de the pipe as this may cause a damage to the gaskets seals of the piston and the valves jeopardising the correct functionality of the system Remove the nut and the compression fitting ring from the silencer joint Insert the compression fitting ring as shown in the figure Make sure that the silencer joint is tight Clean and apply a thin layer of oil to the thread and the joint area Insert the tube...

Страница 10: ...DJUSTMENT OF THE UPWARD HIGH SPEED N 8 Start to send the car upward Loosen the lock nut 8 Tighten the screw 8 till you hear the oil returning to the tank then loosen one turn to close Tighten the lock nut 8 The adjustment is finished If needed in those lifts where the speed must be limited for example Home Lift con V 0 15 m s other lifts just gradually tighten the screw 8 to mach the requested spe...

Страница 11: ...ADJUSTMENT OF THE MINIMUM RAM PRESSURE VSMA 2 1 SYSTEMS N 6 Only in installations with traction 2 1 Close the ball valve S Press the manual lowering button MM to release pressure Check the pressure on the manometer MAN is around 6 bar If the pressure it not correct adjust screw 6 The adjustment is finished 3 11 MANUAL LOWERING OPERATION EMERGENCY ONLY BUTTON MM Press the manual lowering button MM ...

Страница 12: ... of the oil 6 Motor protection operation 6 Filters 1 Pressure check 6 Pressure gauge shut off 6 6 Pressure test static pressure x2 6 Ball valve seal 6 Labels signs and schemes 6 Overall check up 5 4 3 MAINTENANCE OPERATIONS What to do Valve gaskets seals At the end of installation and during check ups verify the gasket seals in the following way with the oil at room temperature close the ball valv...

Страница 13: ...se the ball valve S again Continuing with the hand pump reach the desired pressure value controlling with the pressure gauge After the test completely unload the pressure pushing with a screwdriver on the VMD valve Close the pressure gauge exclusion valve Disconnect the hand pump Screw the pressure gauge MAN Ball valve seal Close the ball valve S and open the pressure gauge shut off RUB Fully disc...

Страница 14: ...ward speed is less than the upward speed DEVICES VRF VMD COMPENSATOR VRF Check the adjustment of the screw 8 VMD Check the cleanliness of filters and restrictors SPEED COMPENSATOR Check the perfect sliding of the spool If it s necessary tighten the screw 9 to increase downwards speed The lift only runs at high speed both upward and downward DEVICES VML VRF VML Check that the screw 3 is open Clean ...

Страница 15: ...ENG 1 01 1 0991 497 EN 24 03 2017 15 16 3010 VALVE MANUAL INSTALLATION USE AND MAINTENANCE ...

Страница 16: ...NCE 16 16 Doc n 1 0991 497 Rev 1 00 24 03 2017 File 3010 3_4_10991497EN doc FLUID DYNAMICS EQUIPMENTS AND COMPONENTS FOR LIFTS UNI EN ISO 9001 Certified Company GMV SPA Via Don Gnocchi 10 20016 PERO Milano Italy TEL 39 02 33930 1 FAX 39 02 3390379 http www gmv it e mail info gmv it ...

Отзывы: