INTRODUCTION:

The HM-630 Moisture Room Control Panel is designed to 
maintain a constant temperature and humidity for concrete 
sample curing rooms. The panel consists of a temperature 
water mixing valve controlled by a digital controller and a 
thermocouple / sealed sensor. The control panel is mounted 
on a PVC backboard that is 30” long and 20” high. It is 
mounted on the wall outside the curing room with the sensor 
mounted on the wall about 4 ft. high inside the curing room. 

The panel is designed to work as a 

closed loop system in 

conjunction with spray heads (1.5 gph) strategically placed in 
the curing room. Hot and cold water is fed into ½” connections 
at the bottom of the panel. The water is regulated and exits 
through a ½” discharge fitting at the top of the panel. This 
outlet is piped directly into the curing room and feeds a 
closed loop piping arrangement with the spray heads. The 
panel has a 3-prong cord that is designed to be plugged into a 
120V/60Hz/15A GFCI protected outlet. The panel is governed 
by a normally closed solenoid valve and an on/off switch 
mounted on the front of the panel. There also is a manually 
controlled by-pass valve in the event of a power outage. The 
mixing valve also has a manual override if the valve must be 
adjusted in the event the AC power goes out.

The panel is designed to maintain a constant temperature at 
100% humidity by the temperature controlled water running 
constantly into the curing room. Please refer to the Installation 
and Operating Instructions for a complete guide in proper 
installation and set-up of the Moisture Room Control Panel.
 

 

INSTALLATION & OPERATION:

This Control Panel is designed and pre-assembled for easy 
installation. The unit must be installed on the outside of the 
moisture room, indoors, and protected from water.

1.  Fasten the control panel to the outside wall of your 

moisture room near the door approximately four feet up 
from the floor and within five feet of a 120V/60Hz/15A 
GFIC outlet. Installation location should make the panel 
easily reachable and convenient to read the controls. 
Secure with large screws.

HM-630

2.  Run the hot and cold water supply lines to the ½” pipe 

fittings at the bottom of the unit. The left one is the “Hot” 
and the right one is the “Cold”.

NOTE: The SharkBite

®

 Connection System Is to be used 

with COPPER or CPVC tubing ONLY!!

To Connect a Joint:
•  Mark 7/8” down the tube.
•  Push the tube firmly until it reaches the mark on tube.

 

To Disconnect a Joint:
•  Push on the plastic release collar with a 5/8” open end 

wrench and pull.

3.  Make an appropriate hole through wall, and run the 

½” waterline up and into your spray head system 
inside moisture room. Spray heads should be rated 
approximately 1.5 gallon per hour each.  

4.  Mount the Temperature Sensor inside the moisture room 

approximately half way between the ceiling and the floor. 
Fill the hole with waterproof sealant. DO NOT extend the 
length of the sensor wire. 