background image

MDE-3839Q Passport™ System Installation Addendum · December 2020

Page 7

Before Installing Passport System

Charging UPS

Unpack and connect the UPS to an AC power outlet, and allow the battery to charge when you 
are setting up the other Passport System components.

After charging for about 40 minutes, the UPS will be able to provide up to 15 minutes of 
backup power. After about two hours, the UPS changes from Fast Charge to Trickle Charge. 
The UPS requires approximately four hours to charge completely.

Transporting Equipment

Always transport the equipment to a site in its original packaging, to avoid damage to the 
shock sensitive components such as hard disk drives. 

Returning Equipment

All equipment or components returned under Gilbarco warranty policy or for repair, must be 
packaged properly to avoid shipping damage.

• Return the equipment in its original shipping container. If the original materials are not 

available, use a durable reinforced corrugated box and suitable packing material 
(polyfoam chips, polyurethane foam chips, or polystyrene foam chips).

• Fill the bottom of the container with at least 2 inches of packing material.
• Ensure that the device is firmly packed.
• Include a description of the malfunction or damage, and return that with shipping 

information.

• Prepare a Warranty Return Materials Authorization Form (for more information, refer to 

MDE-2149 Warranty Return Materials Authorization

) to ship with the device.

Note: Gilbarco recommends that returned equipment be insured. Gilbarco inspects all 

returned equipment for any damage caused during return shipment. The customer is 
responsible for all repair costs of damage to the equipment caused by improper packing 
during return shipment.

Preliminary Preparation

Inspect the site and all system equipment before the equipment installation. Ensure that all the 
required materials are present and the site meets all installation criteria, as specified in this 
manual and in 

MDE-3620 Point of Sale Systems Site Preparation Manual

.

Mounting Locations

To mount and connect the equipment, refer to the appropriate installation poster (refer to 

“Introduction” 

on 

page 1

). Following guidelines must be followed when installing the 

equipment:

• All equipment (except the equipment located in the Manager’s office) must be accessible 

to the site operators and service technicians.

• Install all equipment in an enclosed, weatherproof structure. Ambient room temperature 

must not exceed 104 °F (40 °C) or fall below 50 °F (10 °C). The maximum ambient 
temperature may be allowed only if the equipment is allowed free air flow.

• Do not install the equipment in areas exposed to direct sunlight. Provide shading if direct 

sunlight exposure exists.

• Do not expose equipment to high humidity or where liquid spills may occur.

Содержание Passport MDE-3839

Страница 1: ...s Commission FCC Warning 5 Hazardous Zones 5 UL Approvals System Requirements and Component Specifications 5 Before Installing Passport System 6 Parts List 9 Appendix Procedure to Change POSIFLEX Moni...

Страница 2: ...Administration POS Point of Sale RAS Remote Access Service RFID Radio Frequency Identification STP Submersible Turbine Pump SZR Secure Zone Router UL Underwriters Laboratories UPS Uninterruptible Pow...

Страница 3: ...safety of others to understand the procedures before beginning work Follow the Regulations Applicable information is available in National Fire Protection Association NFPA 30A Code for Motor Fuel Dis...

Страница 4: ...victim for example baby teenager middle age elderly Whether or not victim has received first aid for example stopped bleeding by pressure and so on Whether or not a victim has vomited for example if...

Страница 5: ...manufacturer could void the user s authority to operate this equipment The long term characteristics or the possible physiological effects of radio frequency electromagnetic fields have not been inves...

Страница 6: ...0 Altitude Sea level to 10 000 Thermal printers must use Gilbarco specified paper Operating Environment Aspect Limits Temperature 22 to 131 F 30 to 55 C Relative Humidity 5 to 95 non condensing Altitu...

Страница 7: ...re a Warranty Return Materials Authorization Form for more information refer to MDE 2149 Warranty Return Materials Authorization to ship with the device Note Gilbarco recommends that returned equipmen...

Страница 8: ...e cables between the equipment Do not route data cables in the same conduit as AC wiring or near sources of interference such as fluorescent lights compressor wiring and so on Do not coil bend or tie...

Страница 9: ...cure Zone Router SZR 0 N A 1 S 1 S UPS PA03310004 UPS 6 USB Cable and 6 Power Cord included for V4 and later 1 O 1 O 1 O EDH2 PA0419000X Dispenser Hub Power Supply and two 6 LAN Patch Cords included 0...

Страница 10: ...nitec bag of 5 only packed in Combined and Standalone Install Kits 0 N A 1 Ref N A 1 Ref N A Q13180 16BS Gender Mender Code A Wash 3 bag of 5 only packed in Combined and Standalone Install Kits 0 N A...

Страница 11: ...he Cable Harness Assembly 1 O 1 O 0 N A Customer Display PA03270103A PA03270400 Customer Display 4 Serial Cable and DC Cable 8 to 115 VAC Wall Power Supply included 1 S 1 S 0 N A Touchscreen Monitor w...

Страница 12: ...ional O Qty Standard S Optional O Notes 1 USB to RS 232 Converter choose 16 port converter if Tank Monitor is required for the order 2 CAT5 cable must be ordered separately XX 10 25 and 50 maximum rec...

Страница 13: ...0 N A 1 O SZR PA0424000X SZR with 6 inch DC Power Supply Cord 0 N A 1 O QWERTY Keyboard and Mouse Q13181 09 USB QWERTY Keyboard and Mouse 1 S 1 S UPS PA03310004 UPS 6 USB Cable and 6 Power Cord includ...

Страница 14: ...0 Customer Display Serial Cable 4 and DC Cable 8 to 115 VAC Wall Power Supply included 1 S 1 S PIN Pad with Card Reader PA0411000XXX PA0412000XXX PA0420000XXXX PIN Pad with Card Reader 9 RS 232 Cables...

Страница 15: ...CWS MWS Standalone MWS Q11121 07 Power Strips 1 1 1 Q11121 10 Power Strips 0 1 0 Q13180 20B Gender Mender at USB Converter Bag of 5 Server Environmental Management Console EMC Price Sign Car Wash GSM...

Страница 16: ...ange POSIFLEX Monitor LM 3110E Resolution Setting To change the resolution setting proceed as follows 1 Connect the power cable and power up the monitor From the Control Panel navigate to the Display...

Страница 17: ...the Advanced tab A new window with multiple tabs open see Figure 3 Figure 3 Selecting Advanced Tab 4 Navigate to the Intel HD Graphics Control Panel tab Set values as shown in figure and click Apply s...

Страница 18: ...nd brands are the property of their respective owners and are for identification purposes only Use of these names logos and brands does not imply endorsement 2020 Gilbarco Inc 7300 West Friendly Avenu...

Отзывы: