3.3 Einbau PIAZZETTA
Excavate the pit on the basis of our stated dimensions.
The standard concrete tube prepared for installation:
Grinding an opening for the main supply cable.
Place the concrete tube in the pit, level out and fix with
mortar / concrete
Position the top frame and level out at the correct
mounting depth (level of the asphalt).
Pack the concrete tube and the frame with the requisite
material and set in concrete.
The PIAZZETTA is delivered upside down.
Do not set up the PIAZZETTA via the equipped socket
sides. Otherwise there is a risk of damage.